background image

 

21 

 

- marking of liquid connections 
must be observed and kept in completely readable condition at all costs.

 

 
2.2 Personnel development and training

 

 
The  personnel  responsible  for  operation,  maintenance,  inspection  and  assembly  must  have 
the  corresponding  qualifications  for  those  types  of  work.  Area  of  responsibility,  competence 
and  the  surveillance  of  the  personnel  must  be  regulated  precisely  by  the  operator.  If  the 
personnel do not possess the necessary knowledge, they must be trained and instructed. By 
order  of  the  operator,  the  instruction  and  training,  if  necessary,  can  be  carried  out  by  the 
manufacturer/supplier.  Furthermore  the  operator  must  make  sure  that  the  personnel  have 
completely understood the content of the operation manual.

 

 
 
2.3 Dangers in case of non-observance of the safety notes

 

 
The  non-observance  of  the  safety  notes  can  cause  dangers  to  persons  as  well  as  to  the 
environment and the machine. If the safety notes are not observed, this can result in the loss 
of all compensation claims.  
 
In detail, non-observance can for instance result in the following damages: 
 

Failure of important functions of the machine/unit 

Failure of the prescribed methods for maintenance and repair 

Endangerment of persons through electrical, mechanical and chemical influences 

-  

Endangerment of the environment through leakage of hazardous substances 

 

 

 
2.4 Safety-conscious way of working

 

 
The safety notes listed in this operation manual, the existent national regulations on accident 
prevention  as  well  as  possible  internal  working,  operating,  and  safety  instructions  of  the 
operator must be observed. 
 
 

2.5 Safety notes for the operator/user 
 

-

 

Hot  or  cold  machine  components  which  could  cause  danger  must  be  secured  against 
contact by the customer. 

-

 

Protection against contact with moving parts (e.g. coupling) must not be removed while the 
machine is operating. 

-

 

Leakages (e.g. of the shaft sealing) of hazardous materials to be conveyed (e.g. explosive, 
toxic,  hot)  must  be  discharged  in  such  a  way  that  no  danger  arises  for  persons  or  the 
environment. The legal requirements must be observed. 

-

 

Endangerments  through  electric  power  must  be  eliminated  (details  concerning  this,  see 
e.g.  the  regulations  of  the  VDE  (German  Association  for  Electrical,  Electronic  and 
Information Technology) and the local energy suppliers). 

 

 
2.6 Safety notes concerning maintenance, inspection, and assembly works

 

 
The  operator  must  make  sure  that  all  maintenance,  inspection,  and  assembly  works  are 
carried  out  by  authorised,  skilled,  and  qualified  personnel  which  are  adequately  informed  by 
having thoroughly studied the operation manual.  
Generally,  works  on  the  machine  are  only  to  be  carried  out  when  the  machine  is  turned off. 
The procedure of switching off the machine, which is described in the operation manual, must 
be observed at all costs. 

Summary of Contents for Kompaktboy Series

Page 1: ...1 Abwasser Hebeanlage Sewage ejection unit Station de relevage des eaux us es Betriebsanleitung Operation manual Manuel d utilisation Kompaktboy...

Page 2: ...Ersatzteilherstellung 7 2 8 Unzul ssige Betriebsweisen 7 3 Transport und Zwischenlagerung 7 3 1 Transport 7 3 2 Zwischenlagerung Konservierung 7 4 Beschreibung 7 4 1 Allgemeines 7 4 2 Aufbau und Arbe...

Page 3: ...14 35 EU EMV Richtlinie 2014 30 EU Maschinenrichtlinie 2006 42 EG Angewendete bereinstimmende Normen insbesondere EN 60335 1 2012 A11 2014 EN 60335 2 41 2003 A2 2010 EN 809 1998 AC 2010 EN 55014 1 200...

Page 4: ...Bestellungen richten Sie bitte an Ihren Fachh ndler 1 3 Technische Daten Typ Kompaktboy Leistung P1 kW Leistung P2 kW Spannung U V Kondensator C F Strom aufnahme Imax A Drehzahl n min F rder menge Qm...

Page 5: ...anschluss Vereinigungsst ck nur Doppelanlage 2 Sicherheit aus VDMA Einheitsblatt 24 292 Diese Betriebsanleitung enth lt grundlegende Hinweise die bei Aufstellung Betrieb und Wartung zu beachten sind D...

Page 6: ...ersagen vorgeschriebener Methoden zur Wartung und Instandhaltung Gef hrdung von Personen durch elektrische mechanische und chemische Einwirkungen Gef hrdung der Umwelt durch Leckage von gef hrlichen S...

Page 7: ...r Verwendung entsprechend Abschnitt 1 Allgemeines der Betriebsanleitung gew hrleistet Die im Datenblatt angegebenen Grenzwerte d rfen auf keinen Fall berschritten werden 3 Transport und Zwischenlageru...

Page 8: ...plan des Schaltger tes 5 Installation 5 1 Vorbereitungen Der st rungsfreie Betrieb der Hebeanlage ist nicht zuletzt von einer korrekten und einwandfreien Montage abh ngig Aus diesem Grund m ssen folge...

Page 9: ...d muss seinen Einlauf mindestens 200 mm ber dem Aufstellniveau der Hebeanlage haben 5 2 3 Druckleitung Die DIN 19 760 Teil 3 sagt aus R ckflussverhinderer m ssen nach dem Unterbrechen des F rderstroms...

Page 10: ...r ber hren Bei Verwendung eines Verl ngerungskabels muss dieses qualitativ dem mitgelieferten Anschlusskabel entsprechen Der Schaltkasten muss so angebracht werden dass der blaue Pneumatikschlauch f r...

Page 11: ...ungsintervalle Inspektions und Wartungsintervalle nach DIN 1986 Teil 31 Abwasserhebeanlagen sollen monatlich einmal vom Betreiber durch Beobachtung eines Schaltspiels auf Betriebsf higkeit und Dichthe...

Page 12: ...Ursache Behebung 1 Motor dreht nicht zu geringe Spannung Spannung fehlt Versorgung pr fen falscher Stromanschluss Korrektur Stromkabel defekt Austausch Kundendienst Fehler am Kondensator nur bei 230 V...

Page 13: ...r Wahl durch Reparatur oder Austausch unentgeltlich alle M ngel die auf Material oder Herstellungsfehler zur ckzuf hren sind Von der Gew hrleistung ausgenommen sind Sch den die auf unsachgem em Gebrau...

Page 14: ...14 Anhang A Einbaubeispiel...

Page 15: ...15 Anhang B Abmessungen Kompaktboy Kompaktboy Doppel...

Page 16: ...190x5 16431 13 4 Innensechskantschraube M8x25 16381 14 1 lbef llschraube M 8x10 16503 15 2 Winkelt lle R 3 8 10705 17 1 Entl ftungsschlauch 0 25 m 10704 18 2 Schlauchschelle 16644 1 Schaltger t Einze...

Page 17: ...fabrication of spare parts 22 2 8 Unauthorised modes of operation 22 3 Transport and temporary storage 22 3 1 Transport 22 3 2 Temporary storage conservation 22 4 Description 23 4 1 General 23 4 2 Com...

Page 18: ...C low voltage directive 2014 35 EU EMC directive 2014 30 EU Machinery directive 2006 42 EC Applied conform standards particularly EN 60335 1 2012 A11 2014 EN 60335 2 41 2003 A2 2010 EN 809 1998 AC 201...

Page 19: ...rders address yourself to your specialist retailer 1 3 Technical data Type Kompaktboy Output power P1 kW Output power P2 kW Voltage U V Capacitor C F Power reception Imax A Rotational speed n min Flow...

Page 20: ...t be taken into account during assembly operation and maintenance works Therefore before assembly and commissioning this operation manual must be read by the assembler as well as by the responsible pe...

Page 21: ...ironment through leakage of hazardous substances 2 4 Safety conscious way of working The safety notes listed in this operation manual the existent national regulations on accident prevention as well a...

Page 22: ...e simplex units ready for connection short time flood proof with gas tight and odour tight collecting tanks made of plastics They are operated with vertical blockage free sewage pumps with automatic p...

Page 23: ...the collecting tank 5 2 Assembly During assembly it is essential to ensure a zero potential and tight installation of the pipelines and valves 5 2 1 Placement The sewage ejection units of the type se...

Page 24: ...must be equipped with earthing terminals The electrical connection may only be effected by an electrically skilled person The relevant VDE regulations 0100 must be respected The mains to which the un...

Page 25: ...vely used other switching points can be adjusted on the control in order to increase the backwater volume Minimum inlet height Switching off point N1 Switching on point N2 Switching on point N3 Duplex...

Page 26: ...k walls 7 2 2 Non return valve Close the gate valve of the pressure pipe if existing For exhaustion of sewage from the non return valve there is a drilled hole with a 1 internal thread and equipped wi...

Page 27: ...cement Non return valve blocked Cleaning Gate valve blocked or worn Cleaning open Pressure pipe blocked Cleaning Intake fitting blocked Cleaning Wrong rotational direction Corrective measure Water def...

Page 28: ...28 Appendix A Installation example Gate Flexible connection piece DN65 for the ventilation pipe Flange piece DN110 with flexible connection piece...

Page 29: ...29 Appendix B Dimensios Kompaktboy Kompaktboy Duplex...

Page 30: ...el cover compl incl pos 10 11 24 16447 12 1 O ring 190x5 16431 13 4 Allen head screw M8x25 16381 14 1 Oil filling screw M 8x10 16503 15 2 Angle nozzle R 3 8 10705 17 1 Ventilation hose 0 25 m 10704 18...

Page 31: ...es et fabrication des pi ces de rechange 37 2 8 Modes de fonctionnement inadmissibles 37 3 Transport et stockage 37 3 1 Transport 37 3 2 Stockage conservation 37 4 Description 37 4 1 G n ralit s 37 4...

Page 32: ...ive la basse tension Directive 2014 30 EU relative la comptabilit lectromagn tique Directive 2006 42 EG relative aux machines Normes harmonis es appliqu es principalement EN 60335 1 2012 A11 2014 EN 6...

Page 33: ...des et commandes Pour toute demande de devis et de commande veuillez vous adresser votre revendeur sp cialis 1 3 Donn es techniques Type Kompaktboy Puissance P1 kW Puissance P2 kW Tension U V Capacito...

Page 34: ...r la ventilation clapet de retenue int gr int gr dans le r servoir branchement flexible pour le raccord de refoulement 2 S curit d apr s les normes de la fiche technique 24 292 de la VDMA Ce manuel d...

Page 35: ...ctions en r paration de dommages Ci apr s quelques exemples de dangers r sultant du non respect des consignes de s curit Pannes de fonctions importantes de la machine du syst me D faillances de m thod...

Page 36: ...s accessoires autoris s par le fabricant servent assurer la s curit L utilisation d autres pi ces est susceptible d annuler la responsabilit en cas de dommages en r sultant 2 8 Modes de fonctionnement...

Page 37: ...tion doit tre bien a r sec et l abri du gel Le lieu d installation doit tre suffisamment bien mesur La hauteur du lieu doit s lever d environ 2 2 5 m Selon la directive DIN 1986 Partie 3 Tous les l me...

Page 38: ...nt se situer au moins 180 mm au dessus du niveau d installation de la station de relevage 5 2 3 Conduite de refoulement La directive DIN 19 760 Partie 3 d clare Les clapets de non retour doivent emp c...

Page 39: ...es La s paration compl te avec le r seau est ainsi garantie avec s ret et la marche sur 2 phases est alors exclue Tous les appareils lectroniques comme le tableau de commande l metteur de l alarme et...

Page 40: ...s de l arriv e normale lavabo toilettes etc Le syst me doit d marrer automatiquement pomper vide le r servoir puis de nouveau s teindre Aucune eau ne peut revenir de la conduite de refoulement dans le...

Page 41: ...ge vidange peut par ex galement tre install cet emplacement Vous pouvez maintenant ouvrir le panneau d acc s et nettoyer le clapet de retenue de l int rieur 7 2 3 Autres Tous les autres travaux de mai...

Page 42: ...change remplacement service client 2 Le moteur d marre mais ne refoule pas roue bloqu e ou us e nettoyer changer clapet de retenue bouch nettoyer vanne interm diaire bouch e ou ferm e nettoyer ouvrir...

Page 43: ...techniques Sous r serve de modifications techniques des fins d am lioration Annexe A exemple d installation Vanne DN 100 raccord flexible DN65 pour conduite de ventilation Bride collerette DN 100 ave...

Page 44: ...dimensions Kompaktboy Ventilation DN70 Ouverture d inspection Clapet de retenue int gr Raccord 1 1 2 Pompe manuelle membrane Sortie de pression DN 100 Tube Pitot Couvercle de r vision 1 vidange clapet...

Page 45: ...W 190 mm 14786 9 1 pompe vortex 3 0 kW 125 mm 11935 10 1 cache roue complet y compris pos 10 11 et 24 16447 12 1 joint torique 190x5 16431 13 4 vis t te hexagonale int rieure M8x25 16381 14 1 bouchon...

Reviews: