
2. Device Installation
5
C h a p t e r 2
Device Installation
Unpack the unit and verify shipment content with the packing list :
•
One GA90 equipment.
•
One power cable.
•
One Ethernet cable.
•
One electronic mannual CD.
•
Accessories package: 2 GA90 fixers, 8 M3 screws for fixing on GA90, 6 M6 screws for fixing
on 19# rack.
Note:
If there is any missing or damage, contact the seller or Zed-3 sales immediately and save
all packages for the repackaging if need.
2.1
Installation Requirements
2.1.1
Power Requirements
•
Power-off before installation, dismantlement or movement.
•
The electric outlet shall be installed near the equitment and shall be easily accessible in case
of emergency.
2.1.2
Anti-static Requirements
•
If the device's power line need to be put outside, take necessary anti-static action please.
•
Anti-static Requirements
-
Static will damage the circuit or the whole machine seriously if static exceed the limitation,
so make sure the ground bus well enough.