5
Legend Plus & Expert Plus edition
82 mm
55 mm
55 mm
7
Determine the position of the spotlights in the beams and drill a maximum of three Ø 32 m holes.
8
Lay the cables for the spotlights in the beams from the wall side.
Please note! Let the cables protrude 10 to 15 cm. Don’t shorten the cables!
9
Drill one Ø 82 mm hole at the end of the gutter for the leaf trap.
32 mm
max. 3