![zarges PaxTower S-PLUS 1T Assembly And Use Instructions Download Page 48](http://html1.mh-extra.com/html/zarges/paxtower-s-plus-1t/paxtower-s-plus-1t_assembly-and-use-instructions_3308944048.webp)
48
The following step only
applies to scaffold towers
of size 4.
6.
Place temporary boards
on the sixth rungs.
7.
Install the horizontal
brace on the sixth
rungs, opposite
the folding frame.
The following step only
applies to scaffold towers
of size 6.
8.
Install the platform on
the sixth rungs as a
temporary board and
lock the claws in place
on the opposite sides.
1.
2.
9.
Insert the one-metre
push-on end frames
on both sides and push
them in until the spring
clips snap into place.
10.
Climb onto the platform
via the trapdoor.
11.
Insert the two-metre
push-on end frames
on both sides and push
them in until the spring
clips snap into place.
12.
Install the diagonal