INSTALLATION INSTRUCTIONS
14
Installation of the hood canopy C
Drilling the wall
a) Using the cardboard template provided, mark on the wall the centres of holes
1
for fixing of the hood canopy
C
.The centre of hole
2
for fixing the chimney, (
a
) air outlet directed upwards or towards the wall, (
b-c
) air
outlet to the right or left hand side, must be marked at a distance
X
from the line between holes
1
,obtained by
measuring the extension
Z
of the chimney required for installation, plus 18 mm
X
=
Z
+25-7.Using a Ø8 mm
drill bit, drill the points marked in this way.
b) When installed with the air outlet directed towards the wall (
a
), it will be necessary to drill an air ducting
opening, measuring
Ø120
mm, according to the diameter of the flange
F
provided.
Fitting the fixing elements
a) Insert the rawl plugs into holes
1
and
2
.
b) Fit the eye bolts
O
.
c) Fix the wall bracket
S
in hole
2
using the screw
V
(not supplied).
ø120
ø
150
100 100
ø 8
7
Z
X
39
25
650
105
105
S36_05
5a
5b
5c
2
1
1
1
1
2
1
1
2
L = 44 m
m
A08_07
V
S
2
A08_06
A
1
Summary of Contents for ZHC 95 ALU
Page 1: ...COOKER HOOD ZHC 95 ALU INSTRUCTION BOOKLET ...
Page 7: ...7 ...
Page 8: ...8 ...
Page 19: ......
Page 20: ...4329478 03 010910 Electrolux Household Appliances Limited 2001 ...