15
GB
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre of
the area in which the hood will be installed.
• Draw a horizontal line at 650 mm above the hob.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the
centre (notch) with the vertical reference line.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper
chimney section supplied), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the holes in the bracket.
• Mark a reference point as indicated at 116 mm from the vertical reference line and 350 mm above the
horizontal reference line.
• Repeat this operation on the other side.
REAR PANEL (OPTIONAL)
The Rear Panel must be fitted before fixing the hood body and, for both upper and lower position fixing,
must be fitted at the correct height prior to installing the bases. As this operation is rather complex, it
should be carried out either by the kitchen installer or a qualified person who knows the final dimensions
of the units.
For the upper fixing position, proceed as follows:
• Rest the back panel on the base, inserting the lower plate between the upper surface and the wall,
centring it on the vertical reference line.
• Mark the centres of the two holes in the upper plate.
• Drill ø 8 mm holes at all the centre points marked.
11
12a
H
350
X
116
1÷2
116
650 min.
7.2.1