
9
A: Assemble the ZEKU-L body.
B: Attach top hook of inner tent to D-ring on center pole.
Adjust height by pulling on the tab, then Velcro into place.
(Tilt the center pole to easily reach the top.)
C: Wrap the inner tent’s two center
cord-locks securely around the
center pole (2 locations)
CENTER POLE SET
1
A
B
Adjust
Adjuster
1: Pass Cord-Lock through Loop
2: Tighten
Attach Hook
1
2
Cord-Lock
C
Velcro into
Place