RIGGING & MOUNTING
These units are suitable for overhead rigging. See below rigging instructions.
Attention to Riggers:
1. Hook rigging sling through holes/insert 3
"
nominal pipe through holes in the base rail, as shown below.
2. Holes in base rail are centered around the unit center of gravity.
3. Use wooden pallet or spreader bar when rigging, to prevent the slings from damaging the unit.
Caution:
All panels should be in place when rigging. Care must be taken to avoid damage to the coils during handling.
For proper drainage, the condensing unit to be raised off the mounting pad. On roof top applications, locate unit at least
6
"
(152 mm) above roof surface. Place unit above a load-bearing wall, isolate unit and piping set from structure. Use
4
"
x4
"
x1
"
thick rubber/cork mounting pads.
Arrange supporting members to adequately support unit and minimize transmission of vibration to building.
CX360
STRAP OR SEAMLESS PIPE
BUCKLE
DETAIL - A
2000mm
RIGGING
CX150 - CX220
CX240 - CX300
7