
ZM80D-HP
www.zalman.co.kr www.zalmanusa.com
14
Front
Back
(O)
(X)
(X)
AGP Slot
Backside Heatsink
Frontside
Heatsink
Fixing Bolt
1) The heatpipes installed on the VGA card should look exactly like the diagram below labeled (0). Check the diagram to make sure they
have been correctly installed.
2) Make sure the Thermal Grease has been applied properly.
Application areas : VGA Chipset, Frontside Heatsink heatpipe grooves, Frontside Heatsink Base heatpipe grooves, Backside Heatsink
Base, Backside Heatsink heatpipe grooves.
3) Make sure that the Frontside Heatsink and Backside Heatsink are horizontally and vertically aligned. (Refer to installation step 6.20.)
4) An adhesive sticker should be stuck on the bottom of the Backside Heatsink Base. (Refer to installation step 6.7.)
5) The heatpipes must be tightly held between the heatsinks and the heatsink bases.
6.22 Confirming Installation
1) Install the VGA card with this product into the mainboard AGP slot.
2) Using a Fixing bolt, fasten the VGA card to the slot.
3) Connect the power connector if the VGA card has one.
4) After installing the VGA card, turn on the computer, and check whether
the temperature of the heatsinks are similar. (Run your system for about
10 minutes before you check the temperature. Normally the temperature
difference between the Frontside and Backside heatsinks is 3~5
℃
)
6.23 Installing the VGA card
Note) When installing a VGA card with this product into the AGP slot,
do not hold the heatsinks while pushing the card down. It may
move the Plate Springs and Screws, causing installation
problems. Hold and apply pressure only on the VGA card’s
circuit board.