4
Installation
Turn the computer
’
s power OFF and unplug the
Main Power Cord before installing ZM-MFC3.
Install the ZM-MFC3 into a 5.25" ODD bay as
shown in the diagram.
Connect the components as shown above and use adhesive tape to connect the temperature sensors to
components for temperature monitoring. Please refer to pages 5~6 for C3 and Y Cable connection instructions.
1
2
3
ZM MFC3 Installation
Screw(PWH M3X5)
Summary of Contents for ZM-MFC3
Page 1: ......