
4.9 Silicone Tube Connection
4.10 Installation Troubleshooting
4.11 Water Block Removal
(1) Please refer to the manual included with the CPU waterblock (ZM-WB5) for installation
guides.
(2) The user can add optional VGA and Northbridge waterblocks.
(3) Use Needle - Nose Pliers to loosen and pull back the Tube Clamp on the tip of the Tube
connecting the Water Pump’s outlet to the Tube Nipple, then disconnect the Tube from
Tube Nipple.
(4) Connect the tip of the disconnected Silicone Tube to the Inlet of the CPU Water Block and
secure with the Tube Clamp.
(5) Use the separately provided tube to connect the CPU Waterblock’s outlet and join with the
Tube Nipple from of step 3.
(6) After the Silicone Tube installation is completed, please check for tensile forces in the tube
by repeatedly opening and closing the side panel. Please adjust the Tube length to
prevent tension in the Tube.
(7) If optional VGA/Northbridge Water blocks are, please repeat the “tension test” and adjust
Tube the length as needed.
Refer to the diagram below as a reference for the coolant’s circulation path/ order.
(1) To allow adequate degassing, please disassemble the Waterblock’s from the motherboard
as shown below.
(2) Skipping procedure will prevent adequate degassing due to internal pressure within the
Tubes.
Note 1) Please do not apply Thermal Grease or Pads when installing waterblocks.
Note 2) Please refer to each product's manual when installing VGA/Northbridge waterblocks.
Note) Please place the Waterblock’s at or below the height of the pump for the degassing procedure.
With CPU Water block installed alone
VGA Water Block installed with CPU Water Block
Tube Clamp
VGA Water Block
CPU Water Block
Tube Nipple
11
12
Summary of Contents for LQ1000
Page 1: ......