Z3 Technology Z3-MVE-SPEC User Instructions Download Page 7

 

           

 

      CONFIDENTIAL 

           DOC-USR-0206-01 

____________________________________________________________________________________

 

Z3 Technology, LLC 

 100 N. 8th St. STE 250 

 Lincoln, NE 68508-1369 USA 

 +1.402.323.0702

 

 

The exact function of these connectors are assigned by the blades, please consult the specific blade 

user’s guide to determine the ultimate function of the connector.

 

 

6.0

 

GETTING STARTED AND RUNNING THE Z3-MVE-SPEC 

6.1

 

Basic Setup and Operation 

(1)

 

Mount the MVE-SPEC chassis onto a 19-inch standard rack 

(2)

 

Plug and route the AC power cord to the AC power source 

(3)

 

Insert and lock all desired function blades 

(4)

 

Insert and lock as many blank panel covers as necessary to completely close the front of the  

   

unit. 

(5)

 

Connect the cables as required per each function blade 

(6)

 

Turn power on 

 

NOTE

: It is mandatory to have all slots of the chassis occupied, and the BLE264-FP blanks *

MUST

* be used 

where there are no active blades. The entire front of the MVE-SPEC must be enclosed. 
 

7.0

 

IMPORTANT NOTES 

7.2

 

Compatible Blades 

Only insert into the MVE-SPEC blades compatible with the MVE-SPEC system. At the time of this 
writing the compatible function blades are BLE264-H4 (4 channels of H264 encoding with HDMI 
input), BLE264-S4 (4 channels of H264 encoding with SDI input) and the BLD265-SC2 (two channels of 
H264 or H265 decoding with composite and SDI output). 

Please consult Z3 Technology for additional functions. 

7.3

 

Cooling 

The MVE-SPEC chassis contains four fans used to bring in cool air from the front of the rack. The cool 
air is forced through the function blades, which typically contain a number of heat sinks, and 
expelled through the vents on the rear of the rack. 

It is very important to keep the air intake path on the front of the unit unobstructed and free of 
debris. 

It is also important to only operate the unit with all card slots covered to maintain the integrity of 
the air flow. The MVE-SPEC must have its front panel completely enclosed even when less than four 
slots are taken by function blades. In this case the unused slots must be enclosed using blank panel 
covers, part number BLE264-FP. 

7.4

 

Order of populating blades into the MVE-SPEC chassis 

Blades can be inserted in any slot without any particular order. 

Summary of Contents for Z3-MVE-SPEC

Page 1: ...echnology LLC All rights reserved This document contains proprietary and confidential information of Z3 Technology LLC Z3 This document may not be used reproduced disclosed or disseminated to anyone without prior written approval of an authorized Z3 representative Z3 Technology LLC incorporates HDMI technology The terms of HDMI and HDMI High Definition Multimedia Interface and the HDMI Logo are tr...

Page 2: ...____________________________________________________________________ Z3 Technology LLC 100 N 8th St STE 250 Lincoln NE 68508 1369 USA 1 402 323 0702 REVISION HISTORY Version Date Change Note Author 1 0 0 11 26 2019 Original Document for MVE SPEC SI ...

Page 3: ...ERAL INFORMATION 5 1 1 Preface 5 2 0 INCLUDED PARTS LIST 5 3 0 FEATURES 5 4 0 OPERATING CONTROLS 5 4 1 MVE SPEC 5 5 0 CONNECTIONS 6 5 1 AC Power 6 5 2 Serial Port Jacks 6 6 0 GETTING STARTED AND RUNNING THE Z3 MVE SPEC 7 6 1 Basic Setup and Operation 7 7 0 IMPORTANT NOTES 7 7 2 Compatible Blades 7 7 3 Cooling 7 7 4 Order of populating blades into the MVE SPEC chassis 7 7 5 No hot plugging of cards...

Page 4: ...________________________________________ Z3 Technology LLC 100 N 8th St STE 250 Lincoln NE 68508 1369 USA 1 402 323 0702 LIST OF FIGURES Figure 1 Parts Included with the Z3 MVE SPEC 5 Figure 2 MVE SPEC Front View 6 Figure 3 MVE SPEC Rear View 6 Figure 4 Power LED definitions 6 ...

Page 5: ...red MVE SPEC AC Power Supply 3 0 FEATURES Compact 1 RU design fits 19 inch rack systems Four card slots for four independent video encoding or decoding systems Provides the foundation for highly configurable video systems Shallow rack depth requirement of 355mm Provides up to 150W of DC power to the function slots Operating temperature frame only 0 to 50 degrees C at 20 80 relative humidity Storag...

Page 6: ...sis Power LED indications are Power LED Status Power LED Green Power On chassis Power LED Red or blink Red Alarm triggered by a function on a blade or blade function locator request Figure 4 Power LED definitions 5 0 CONNECTIONS All connections to the MVE SPEC frame are on the rear as follows 5 1 AC Power Power jack for AC power input compliant with IEC 60320 1 C14 5 2 Serial Port Jacks The rear p...

Page 7: ...s Only insert into the MVE SPEC blades compatible with the MVE SPEC system At the time of this writing the compatible function blades are BLE264 H4 4 channels of H264 encoding with HDMI input BLE264 S4 4 channels of H264 encoding with SDI input and the BLD265 SC2 two channels of H264 or H265 decoding with composite and SDI output Please consult Z3 Technology for additional functions 7 3 Cooling Th...

Page 8: ... current Typ 35A 115VAC 70A 230VAC Maximum power consumption 250W Sixteen 2 5mm barrel jacks for serial communication four per slot Operating temperature 0 C to 50 C 20 80 RH non condensing Storage temperature 10 C to 80 C 20 80 RH non condensing Card size 90x200 mm When contacting Z3 Support for additional support please click the download device logs button in the GUI at the time the problem occ...

Reviews: