User’s Manual
107
6. I
NSTALLATION
, M
OUNTING
,
AND
C
ARE
G
UIDELINES
Chapter 6 describes some considerations for mounting the
OP7200 in a panel, and includes detailed mounting instructions
and care guidelines for cleaning the screen overlay.
6.1 Installation Guidelines
When possible, following these guidelines when mounting an OP7200.
1. Leave sufficient ventilation space, at least 1" (2 cm) around the unit on all sides.
2. Do not install the OP7200 directly above machinery that radiates a lot of heat (for
example, heaters, transformers, and high-power resistors).
3. Leave at least 8" (20 cm) distance from electric power lines and even more from high-
voltage devices.
4. When installing the OP7200 near devices with strong electrical or magnetic fields (such
as solenoids), allow a least 3" (8 cm), more if necessary.
The OP7200 has strong environmental resistance and high reliability, but you can maxi-
mize system reliability by avoiding or eliminating the following conditions at the installa-
tion site.
•
Abrupt temperature changes and condensation
•
Ambient temperatures exceeding a range of 0°C to 50°C
•
Relative humidity exceeding a range of 20% to 70%
•
Strong magnetism or high voltage
•
Corrosive gasses
•
Direct vibration or shock
•
Excessive iron dust or salt
•
Spray from harsh chemicals
Summary of Contents for eDisplay OP7200
Page 1: ...eDisplay OP7200 VGA Operator Control Panel User s Manual 019 0116 021001 A ...
Page 6: ...eDisplay OP7200 ...
Page 44: ...38 eDisplay OP7200 ...
Page 128: ...122 eDisplay OP7200 ...
Page 136: ...130 eDisplay OP7200 ...
Page 144: ...138 eDisplay OP7200 ...
Page 146: ...140 eDisplay OP7200 ...
Page 150: ...144 eDisplay OP7200 ...
Page 152: ......