background image

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

APPLIANCE CONNECTION

  

  Refer  to  the  appliance  manufacturer's  installation  manual  for  proper  method  of  joining

  Z-VENT

  to  the  appliance  collar.  An 

appliance adapter to suit specific requirements may be obtained from Z-FLEX.   

 

IMPORTANT NOTICE 

    When any of the previous installation procedures are completed, be sure to go over the entire system to make sure all joints are 

secure and sealed correctly. The seams and joints must be checked for tightness prior to using the venting system.  

  A  qualified  inspector  must  check  the  entire  system  at  least  once  annually  following  initial  installation  to  maintain  the 

Z-FLEX

 

warranty.   

   The installation must conform to the requirements of the appliance manufacturers' instructions, The National Fuel Gas Code and 

local codes and regulations. 

 

 

 

Summary of Contents for Z-Vent SVE III Series

Page 1: ...and contract Pipe must be properly supported Proper joint assembly is essential for a safe installation Follow these instructions exactly as written Check severeness of joints upon completion of assem...

Page 2: ...e more than 3 ft 91 m from any other building opening gas utility meter service regulator or the like 6 Exterior mounted venting systems should be enclosed below the roof line with a chase to limit co...

Page 3: ...rds termination NOTE Some flue collars may require the use of high temperature silicone sealant to make a positive pressure gas tight seal IMAGES 1 2 3 CLEARANCE TO COMBUSTIBLES SIDE WALL VENTING INST...

Page 4: ...I III or IV appliances or downwards for Category III or IV appliances not less than 1 4 6 4 mm every 12 inches 305 mm to prevent collection of condensate at any location in the assembly Fasteners must...

Page 5: ...5 IMAGE 8 IMAGE 9 ILLUSTRATION 2...

Page 6: ...installed Where the vent passes through the roof a flashing must be used to maintain the required clearances and to protect from the elements The framed opening must be large enough to provide the nec...

Page 7: ...be used to support the system 1 Install the Guy Band below the Rain Cap using the 10 24 screw and nut provided 2 Attach stainless steel or galvanized cable with a minimum rated capacity of 500lbs to e...

Page 8: ...last pipe length and attach top support to pipe Leave 6 150 mm of pipe protruding from flashing so that rain cap may be installed and to allow for any adjustment to line up base tee properly see image...

Page 9: ...s are completed be sure to go over the entire system to make sure all joints are secure and sealed correctly The seams and joints must be checked for tightness prior to using the venting system A qual...

Page 10: ...XPRESS WARRANTY HAS BEEN MADE OR WILL BE MADE ON BEHALF OF SELLER WITH RESPECT TO THE Z VENT OR THE INSTALLATION OR REPLACEMENT OF THE Z VENT SELLER SHALL NOT BE LIABLE FOR ANY SPECIAL INCIDENTAL INDI...

Reviews: