
DP-2010RXNLF 08202001 ATEX Rev.
YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5793 • F: 936.788.5720
9
5.2 Optional DPS-2
Maximum Pipeline Pressure is 1500 psi,
when using this option.
a. With the low pressure supply valve and the high
pressure supply valve closed, connect the DPS-2
to the orifice connection tubing.
b. Open the equalization valve.
c. Open the low pressure supply valve or the high
pressure supply valve.
NOTE: Do not open either the low pressure
supply valve or the high pressure supply valve
without ensuring that the equalization valve is
open. Failure to do so may damage the
DPS-2's internal components.
d. Open the other supply valve.
e. Close the equalization valve.
f. Run the free end of the DPS-2 cable through
the cable entry connector located on the upper left
side on the DynaPak 2010 enclosure.
g. Connect the DPS-2 cable as shown in the
diagram.
h. Tighten the cable entry connector, allowing for
enough cable length to open the enclosure.
High Pressure Supply Valve
Orifice Connection
Equalization Valve
Low Pressure Supply Valve
Flow
Low Pressure
High Pressure
Factory
Approved
System
Mutual
Clear
Black
5. System Installation
Maximum
Pipeline
Pressure
1500 psig.
Summary of Contents for DynaPak 2010 Series
Page 1: ...DynaPak Gas Sampler S Y S T E M S U P P O R T M A N U A L DP 2010RXNLF...
Page 2: ...2...
Page 28: ...28 Diagram 3 YZ filter regulator assembled...
Page 36: ...Notes...
Page 37: ...Notes...