background image

Wear parts and accessories

4210W / 4211

10

ba76138d05

06/2018

7

Wear parts and accessories

8

Disposal

At the end of its operational lifetime, the electrode must be returned to the 
disposal or return system statutory in your country (electronic waste). If you 
have any questions,
please contact your supplier.

IDS plug

Connection type

4-P-pin, watertight plug connection with 
locking device, reverse polarity protected

Storage

With watering cap; filled with KCl 3 mol/L, Ag

+

 free

Maintenance

equipment

Description

Model

Order no.

Reference electrolyte solution 250 ml 
to fill the watering cap
(KCl 3 mol/l, Ag

+

-free)

KCl-250

109 705Y

Zobell ORP buffer solution (125 ml)

3682

061320Y

Connection cable

4211 - meter

Description

Model

Order no.

IDS connection cable, 1.5 m

IDS-CABLE-
1.5

903 850Y

IDS connection cable, 3 m

IDS-CABLE-3

903 851Y

Radio connection

4210W - meter

Description

Model

Order no.

WA capable IDS meter 
+ radio module for IDS meter

see Internet

Radio module for plug head sensor

IDS WA-S

108 141Y

Summary of Contents for 4210W

Page 1: ...OPERATIONS MANUAL ba76138e05 06 2018 4210W 4211 ORP ELECTRODE ...

Page 2: ... 4211 Contact YSI 1725 Brannum Lane Yellow Springs OH 45387 USA Tel 1 937 767 7241 800 765 4974 Email info ysi com Internet www ysi com Copyright 2018 Xylem Inc For the most recent version of the manual please visit www ysi com ...

Page 3: ...mmissioning Scope of delivery Electrode 4210W or 4211 Operating manual Commissioning Prepare the electrode for measuring as follows Open the refilling opening for the reference electrolyte solution Depend ing on the model the stopper of the refilling opening is an elastomer stop per or a slider The refilling opening must always be open during measurement Remove the watering cap from the electrode ...

Page 4: ...es while doing so 4210W via a connecting cable accessory to a free IDS connector on the meter or wireless via an IDS WA S adapter acces sory to a WA capable meter Accessories for the connection of the 4211W sensor to the meter See chapter 7 WEAR PARTS AND ACCESSORIES Opening and closing the IDS plug connection see section 2 2OPENING AND CLOSING THE IDS PLUG CONNECTION ...

Page 5: ...king device step 1 Use your thumb and index finger to press the clips of the connector togeth er and pull the connector out of the plug step 2 Closing the plug connection Make sure that the plug connection is perfectly dry and clean Align the guidance of the coupling to the groove in the plug and insert the coupling into the unlocked plug up to the stop step 3 Close the locking device step 4 2 4 3...

Page 6: ...e in the solution in a vertical or slightly tilted position Make sure the immersion depth is correct The junction must be com pletely submersed in the solution The junction is in the area of the bottom end of the shaft see arrow At the same time the level of the reference electrolyte must be at least 2 cm above the level of the solution Conversion to nor mal hydrogen elec trode UH UMeas URef URef ...

Page 7: ...electrode into the watering cap filled with reference electro lyte and shut the refilling opening 15 214 50 188 20 211 55 184 25 207 60 180 30 203 T C URef mV T C URef mV 4210W 4211 4210W 4211 T C U mV T C U mV 4210W 4211 4210W 4211 0 262 30 214 5 254 35 206 10 246 40 199 15 238 45 191 20 230 50 183 25 222 electrode Reference electrolyte Model see page 10 4210W 4211 3 mol l KCl Ag free KCl 250 250...

Page 8: ...ough the junction from the electrode into the test sample If the level of reference elec trolyte becomes too low with time refill it through the refilling opening Refilling the refer ence electrolyte Refilling is very easy using a dropping bottle Proceed as follows Cut off the tip of the dropping bottle at a right angle until the opening in the tip can be seen Open the refilling opening of the ele...

Page 9: ... 32 212 F Typical application Laboratory Accuracy of the IDS measuring technique Measured parameter Accuracy 1 digit U mV 0 2 T C 0 1 General data Reference electrolyte 3 mol l KCl Ag free Junction Ceramic Double junction Yes Electrode material and shape Platinum circle Connection cable Lengths 4211 1 5 m 4210W 1 5 3 m Diameter 4 3 mm Smallest allowed bend radius Fixed installation 20 mm Flexible ...

Page 10: ...olarity protected Storage With watering cap filled with KCl 3 mol L Ag free Maintenance equipment Description Model Order no Reference electrolyte solution 250 ml to fill the watering cap KCl 3 mol l Ag free KCl 250 109 705Y Zobell ORP buffer solution 125 ml 3682 061320Y Connection cable 4211 meter Description Model Order no IDS connection cable 1 5 m IDS CABLE 1 5 903 850Y IDS connection cable 3 ...

Page 11: ... a product for service include the Product Return form with cleaning certification The form must be completely filled out for an YSI Service Center to accept the instrument for service The Product Return form may be downloaded at www ysi com and clicking on the Support tab Telephone 800 897 4151 937 767 7241 Monday through Friday 8 00 AM to 5 00 PM ET Fax 937 767 1058 Email info ysi com Mail YSI I...

Page 12: ...lyze and return water to the environment and we help people use water efficiently in their homes buildings factories and farms In more than 150 countries we have strong long standing relationships with customers who know us for our powerful combination of leading product brands and applications expertise backed by a legacy of innovation For more information on how Xylem can help you go to www xyle...

Reviews: