background image

Stabilisers

Attach one stabiliser to each corner of  tower at approx. 45
degrees. The bottom clamp should be fitted as low as 
possible, refer to the diagram below. Ensure that all 4 
rubber feet are in contact with the ground and that the 
clamps are secured.

Position stabilisers as shown in diagrams.

When using the medium stabilisers, always extend the 
telescopic legs to their maximum position and lock into 
position with the interlock clip.

When moving tower lock each telescopic leg just clear of  
the ground, unlock castors ensuring area is firm and clear 
of  all obstructions both on the ground and above. After 
moving check all castors are firmly on the ground and 
locked, and that the tower is vertical. Re-position stabilis-
ers as above.

Small Stabiliser

Medium Stabiliser

18

2.3m

4.6m

4.2m

2.9m

3.2m

1.3m

Bottom 

clamp

For further information about
this product or any other
products and services,
please contact :

Youngman Group Ltd

The Causeway, Maldon,
Essex, CM9 4LJ,
United Kingdom

t

 +44 (0)1621 745900

f

 +44 (0)1621 859845

e

 [email protected]

youngmangroup.com

Summary of Contents for MiniMax

Page 1: ...rs fitted as specified Platforms located windlocks on Handrails in place Toeboards located Refer to this checklist before using each time Check that all components are on site and that they are functi...

Page 2: ...dismantled Safety First Wind Description Beaufort Scale Beaufort No Speed in m p h Speed in m sec Medium Breeze Raises dust and loose paper twigs snap off 4 8 12 4 6 Strong Breeze Large branches in m...

Page 3: ...ed in total Quantity Schedule in Components Mini Max Tower to HD1004 1 83m platform Length Internal External Use Working Height m 2 8m 3 7m 5 7m 7 8m Platform Height m 0 9m 1 7m 3 7m 5 8m Description...

Page 4: ...izontal Brace on bottom rung Ensure structure is level before tower system Use adjustable legs to level Now fit Spring Interlock clips supplied in Guardrail Pack Assemble the 4 spring locking clips as...

Page 5: ...ern should follow a simple zig zag shape see insert 12 Ensure Intermediate Guardrails are positioned onto the upright above the horizontal tube with the claws locked outwards as shown Then move the pl...

Page 6: ...ling ensuring that no Diagonal Braces or Stabilisers are prematurely released 1 Remove Toeboards and upper Guardrails 2 Go down to lower platform remove upper platform 3 Move lower platform and Guardr...

Page 7: ...ck clip When moving tower lock each telescopic leg just clear of the ground unlock castors ensuring area is firm and clear of all obstructions both on the ground and above After moving check all casto...

Reviews: