Assembly 

5.8m Platform Height: Add 2m Extension 

Pack And Use Medium (SP10) Stabilisers

 

15

 For the 5.8m height 2 further 8 Rung Frames will be 

required plus additional Diagonal and Horizontal Braces,
and a further Trapdoor Platform. Build as shown in 

stages 11 to 14

, taking paticular care to ensure that you 

are fully protected by Guardrails on a Platform during as-
sembly. 

Should the platforms or braces obstruct on any one 

level, simply re-position one of these components by 

one rung to suit.

Dismantling 

The dismantling procedure should follow steps 1 through 
to 14 in the reverse order, but taking particular care with 
the gradual removal of  Guardrails and Platforms. You 
should ensure that you are standing in a safe position and 
protected by Temporary Guardrailing, ensuring that no 
Diagonal Braces or Stabilisers are prematurely released.

1

 Remove Toeboards and upper Guardrails.

2

 Go down to lower platform, remove upper platform.

3

 Move lower platform and Guardrails up two rungs, so

that you can handle the components above without
over-reaching.

4

 From the upper platform, remove Guardrail Frames and

their Guardrails.

5

 Remove remaining platforms, 8 Rung Frames, upper

Guardrails and Diagonals.

15

16

Assembly 

Lower Height Setting

Platform Height = 1.7m
Working Height = 3.7m

Packs Required

1 × Base Pack
1 × Guardrail Pack
2 × Small Stabiliser Packs (if  used externally) For internal 
use stabilisers are not required if  horizontal forces are 
less than 20kg.

Fitting Toeboards

Start with the End Boards which have red plastic clips. 
There are two slots depending on which side you posi-
tion the diagonal brace. Clip into correct slots, as shown, 
ensuring that no large objects can fall through and that 
the trap door can open with ease.

17

Summary of Contents for MiniMax

Page 1: ...rs fitted as specified Platforms located windlocks on Handrails in place Toeboards located Refer to this checklist before using each time Check that all components are on site and that they are functi...

Page 2: ...dismantled Safety First Wind Description Beaufort Scale Beaufort No Speed in m p h Speed in m sec Medium Breeze Raises dust and loose paper twigs snap off 4 8 12 4 6 Strong Breeze Large branches in m...

Page 3: ...ed in total Quantity Schedule in Components Mini Max Tower to HD1004 1 83m platform Length Internal External Use Working Height m 2 8m 3 7m 5 7m 7 8m Platform Height m 0 9m 1 7m 3 7m 5 8m Description...

Page 4: ...izontal Brace on bottom rung Ensure structure is level before tower system Use adjustable legs to level Now fit Spring Interlock clips supplied in Guardrail Pack Assemble the 4 spring locking clips as...

Page 5: ...ern should follow a simple zig zag shape see insert 12 Ensure Intermediate Guardrails are positioned onto the upright above the horizontal tube with the claws locked outwards as shown Then move the pl...

Page 6: ...ling ensuring that no Diagonal Braces or Stabilisers are prematurely released 1 Remove Toeboards and upper Guardrails 2 Go down to lower platform remove upper platform 3 Move lower platform and Guardr...

Page 7: ...ck clip When moving tower lock each telescopic leg just clear of the ground unlock castors ensuring area is firm and clear of all obstructions both on the ground and above After moving check all casto...