background image

JOHNSON CONTROLS

1

Supersedes Form 201.30-CL2 (412)

START-UP checkliST

Form 201.30-CL2 (912)

The following work must be completed in accordance with start-up instructions contained in the installa-

tion, Operation, and Maintenance Manual (Form 201.30-icOM2):

CUSTOMER: _________________________________
ADDRESS: __________________________________
PHONE: _____________________________________

JCI TEL NO: ____________________ JCI ORDER NO: ________________ JCI CONTRACT NO: ____________

JOB NAME:  _________________________________
LOCATION:  _________________________________
CUSTOMER ORDER NO:  ______________________

chilleR MODel NO

: ____________________________

The work (as checked below) is in process and will be completed by:    _____________ / ____________ / 

___________

UNiT SeRiAl NO

: ___________________________

Month

Day

Year

f.  System 1 evaporator pressure transducer  ....

g.  System 1 evaporator oil return to eductor  .....
h.  System 1 oil return eductor to compressor  ....

i.  System 1 liquid injection to compressor (op-

tional)  .............................................................

j.  System 1 economizer pressure transducer  ...

k.  Compressor 2 discharge (optional)  ...............

l.  System 1 condenser subcooler outlet  

(optional)  ........................................................

m.  System 2 main oil supply inline ball valve ......

n.  System 2 condenser pressure transducer  .....
o.  System 2 condenser gas to oil eductor  .........
p.  System 2 evaporator pressure transducer  ....
q.  System 2 evaporator oil return to eductor  .....

r.  System 2 oil return eductor to compressor  ....

s.  System 2 liquid injection to compressor (op-

tional)  .............................................................

t.  System 2 economizer pressure transducer  ...

9.  Verify the shipping anti-freeze solution has been 

drained from the VSD, and replaced with the 

proper amount of inhibited water coolant that 

shipped loose with the chiller. Refer to SEC-

TION 7 - MAINTENANCE in the 201.30-ICOM2 

for filling process.  ...............................................

10.  Verify electrical connections in the VSD are 

tight, especially motor leads to terminals.  ..........

11.  If the VSD provides an optional circuit break-

er at the incoming power connection to 

the VSD, make sure the settings are prop-

erly set per the information on the next page. 

A.  GeNeRAl:

The following basic checks should be made with the 

customer power to the unit switched off.

1.  Review the Installation Checklist (Form 201.30-

CL1).  ..................................................................

2.  Inspect the unit for installation damage that may 

have occurred. If damage is found, take action 

and/or repair as appropriate. ...............................

3.  Water connection inlet and outlet are at proper 

locations, have hangers nearby that would sup-

port their weight and show no visible strain on 

chiller nozzles.  ...................................................

4.  Wiring is complete (power feed terminations in 

the VSD), and all sources of electrical supply to 

the unit are taken from a single point of isolation 

per 201.30-PW2.  ................................................

5.  Confirm any field control wiring modifications 

are in accordance with Form 201.30-PW2  .........

6.  Verify the chiller is charged with refrigerant 

(pressures match R-134a saturation for ambient 

temp).  .................................................................

7.  Verify that the unit’s protective ground terminal(s) 

are properly connected to a suitable grounding 

point. Ensure that all unit internal ground con-

nections are tight.  ...............................................

8.  Verify the following isolation valves are open.

a.  Compressor 1 discharge (optional)  ...............
b.  System 1 condenser subcooler outlet (option-

al)  ...................................................................

c.  System 1 main oil supply inline ball valve ......

d.  System 1 condenser pressure transducer  .....
e.  System 1 condenser gas to oil eductor  .........

MODel – YVWA

(continued on following page)

Reviews: