55
JOHNSON CONTROLS
FORM 160.80-EG1 (808)
START-UP AND OPERATOR TRAINING
The chiller manufacturer shall include the services of a
factory-trained, field service representative to supervise
the final leak testing, charging and the initial start-up and
concurrent operator instruction.