JOHNSON CONTROLS
29
SECTION 3 – HANDLING, STORAGE, INSTALLATION AND REASSEMBLY
FORM 155.30-ICOM2.EN.UL
ISSUE DATE: 12/21/2018
3
VIBRATION AND ISOLATION DETAILS
Before installing the unit, fit rubber vibration isolators to the unit base as shown in
.
Use liners to adjust the levelness of the unit. For unit dimensions, see
.
ITEM
DESCRIPTION
1
Nut
2
Washer
3
Foundation Bolt
4
Sole Plate
5
Rubber Vibration Isolator
(DIA 1)
Base
(DIA 2)
Filling with Mortar
FIGURE 8 -
VIBRATION AND ISOLATION DETAILS
LD20193
1
1
6
4
4
5
6
5
2
2
3
3
DIAGRAM 1
DIAGRAM 2