![background image](http://html1.mh-extra.com/html/york/yefe-bztm-mow1-series/yefe-bztm-mow1-series_service-manual_4773804029.webp)
Maintenance and
Disassembly
Page 25
1.3.1 Indoor Unit
Collecting the refrigerant into the outdoor unit
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
)RUYK
)RUYK
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
)RUYK
2U
.O
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the charge hose with the push pin of Handle
Lo to the 3-way valve’s gas service port.
3.
Open the Handle Lo manifold valve to purge air
from the charge hose for 5 seconds and then close it
quickly.
4.
Close the 2-way valve.
5.
Operate the air conditioner in cooling mode. Cease
operations when the gauge reaches 0.1 MPa
(14.5 Psi).
6.
Close the 3-way valve so that the gauge rests
between 0.3 MPa (43.5 Psi) and 0.5 MPa (72.5 Psi).
7.
Disconnect the charge set and mount the caps of
service port and 2- and 3-way valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18N.m.
9.
Check for gas leakage.
Air purging with vacuum pump
Summary of Contents for YEFE BZTM-MOW1 Series
Page 2: ......
Page 4: ......
Page 18: ...Specifications Page 14 YUFE60BYTM MS 1 R S C YUFE60BYSM MS 1 R...
Page 24: ...Product Features Page 20...