SHOULD YOU REQUIRE ANY ASSISTANCE REGARDING THIS PRODUCT PLEASE CONTACT YORK DIRECTLY
A
B
C
D
E
F
INSTRUCTION
1
2
Lay 1 x
SQUARE PULLEY FIXING PLATE
(90)
on floor, slot
FEMALE SCREW BOLTS
(91)
through the 4 holes from under side upwards and slot a
PULLEY COVER
(84) onto the top 2 bolts followed
by
PULLEY WHEEL
(83)
as illustrated in step A.
Feed
PEC CABLE
(86) around both
PULLEY WHEELS
(83) as illustrated in step B.
Slot a
PULLEY COVER
(84) onto the bottom 2 bolts
followed by
PULLEY WHEELS
(83) and wrap
CONNECTING CABLE
(87) around them
as illustrated in step D.
Slot
PULLEY COVER
(84) on top of
2 x
PULLEY WHEELS
(83) as illustrated in step C.
Note: Be sure to fit
PEC CABLE
(86) through
plastic guides in each
PULLEY COVER
(84)
as illustrated.
Slot
PULLEY COVER
(84)
on top of 2 x
PULLEY WHEELS
(83)
as illustrated in step E.
Note: Be sure to fit
PEC CABLE
(86)
through plastic guides in each
PULLEY COVER
(84) as illustrated.
Fit other
SQUARE PULLEY FIXING
PLATE
(90) over bolts and attach
using
MALE SCREW BOLT
(92) as detailed.
PEC
CABLE
CONNECTING
CABLE
86
87
YORK G510 / 13
92
M8 X 15mm
MALE SCREW BOLT
X
4
91
10mm X 35mm X M8
FEMALE SCREW BOLT x 4
86
PEC CABLE 1780mm LONG x
1
87
CONNECTING CABLE 3135mm LONG x
1
Summary of Contents for G510
Page 1: ...S F E S I T N...
Page 2: ......
Page 36: ...PLACE STAMP HERE PLACE STAMP HERE PLACE STAMP HERE F I T N E S S...