- 2 -
Specifications:
Combustion capacity
Connection caliber (Rc)
Mass
Model
kW
(kg)
Air
Gas
CB-1
5.8
7
CB-2
11.6
1
1/2
CB-3
23.0
14
CB- 4
35.0
●
Reference pressure:
Gas : 2-10 kPa
Air : 6 kPa
2. Installation
(1) Back up the outside surfaces, particularly the bottom surface, of the burner tiles
with refractory bricks, castable refractory or the like to prevent the burner tiles
from dropping.
(2) In installing the burner to the furnace body, fill up the clearance between the
burner mount of the furnace and the burner tiles with refractory mortar and fix the
burner to the furnace.
3. Piping
(1) Direct good care to the inside of the pipe not to leave seal tape fractions, bond,
cutting chips, etc. there which may cause malfunction of the solenoid valve,
governor, valve, etc.
(2) In connecting the pipes, provide pipe support in proper positions to prevent the
application of any excess force.