
YCW 750 OGP Curtain Wall System
E
ff
ective Date: March 26, 2021 | 04-4031-15
Page-11
Vertical
Head
Sill
Inter.
Horizontal
HF-2510-W1
HF-2510-W1
HF-2510-W1
Standard
Shear Block
Standard
Shear Block
Vertical
Incidental
Water Head
Shear Clip
HF-2510-W1
HF-2510-W1
HF-2528-W1
Standard
Shear Block
E-Slot
Shear Block
Detail 4
FRAME FABRICATION
STEP 5
ATTACH SHEAR BLOCKS/CLIPS FOR HORIZONTALS
Standard shear blocks are used to attach horizontal members to the jambs and verticals.
Shear blocks for E-Slots (E1-1200 & E1-1206) are attached the same way.
E1-3503 for 3-3/4” back members.
E1-3504 for 5-1/4” back members.
-Attach shear blocks to jambs and verticals with (2) HF-2510-W1 fasteners per block.
Shear clips are used to attach optional incidental water head members to the jambs and verticals.
E1-3523 for 3-3/4” back members.
E1-3019 for 5-1/4” back members.
-Attach shear clips to jambs and verticals with (2) HF-2528-W1 fasteners per block.
See
Detail 4
.
Note:
Do not attach standard shear blocks at the head and sill for end bays at this time.
See
Step 16
for head and sill end bay attachment.