background image

Yingli Solar PV Modules, Installation and User Manual 

page 7

R E V I S I O N   H I S TO RY 

Date

Edition

Revision Number 

September 1, 2012

The first 

2012-Installation Manual_UL_

EN_201209_v01

Auguest 13,    2013

The second

2013-Installation Manual_UL_

EN_201308_v01.1

September 10, 2013

The third

2013-Installation Manual_UL_

EN_201309_v02

October 22, 2013

The forth

2013-Installation Manual_UL_

EN_201310_v02

April 29, 2014

The fifth

2014-Installation Manual_UL_

EN_201404_v02.1

August 6, 2014

The sixth

2014-Installation Manual_UL_

EN_201408_v02.2

March 18, 2015

The seventh

2015-Installation Manual_UL_

EN_201503_v02.3

June 11, 2015

The eighth

2015-Installation Manual_UL_

EN_201506_v03

July 28, 2015

The ninth

2015-Installation Manual_UL_

EN_201507_v03

Dec 29, 2015

The tenth

2015-Installation Manual_UL_

EN_20151229_V03

 

© Yingli Green Energy Holding Co. Ltd.

InstallationManual_UL_EN_20151229_V03

Yingli Green Energy Holding Co., Ltd. 

[email protected]                                     
Service h86-312-2188055
Complaints h86-312-8922216    

                                 

y i n g l i s o l a r . c o m     

Summary of Contents for YL P-35b Series

Page 1: ...ngli Solar at the time of sale to the direct customer Additional recommendations are provided to enhance safety practices and performance results Please provide a copy of this manual to the PV system...

Page 2: ...PV module surfaces and do not apply paint or adhesive to any of the surfaces including the frame For your safety do not disassemble or modify Yingli Solar PV modules in any way Doing so may degrade pe...

Page 3: ...m2 AM 1 5 and 25 C cell temperature As required by the US National Electric Code NEC the short circuit current Isc should be multiplied by a factor of 1 25 and the open circuit voltage Voc should be m...

Page 4: ...rts of fixed equipment that are able to become energized by the PV system must be connected to the equipment grounding conductor in order to prevent electrical shock Refer to section 250 of the NEC fo...

Page 5: ...for maintaining mechanical connections and holding electrical grounding devices in the proper position for electrical conductivity Such devices where supplied with the module and evaluated through the...

Page 6: ...ds that PV systems be periodically inspected by the installer or other qualified person ThepurposeofthePVsysteminspectionistoensurethatallsystemcomponents are functioning properly At a minimum this in...

Page 7: ...The fifth 2014 Installation Manual_UL_ EN_201404_v02 1 August 6 2014 The sixth 2014 Installation Manual_UL_ EN_201408_v02 2 March 18 2015 The seventh 2015 Installation Manual_UL_ EN_201503_v02 3 June...

Page 8: ...t of the indicated values of Isc Voc and Pmax under Standard Test Conditions irradiance of 1000 W m2 AM 1 5 spectrum and a cell temperature of 25 C Refer to module datasheets for specific power output...

Page 9: ...YL240C 30b 240 30 3 7 93 38 0 8 47 1000 15 YL235C 30b 235 29 9 7 87 37 6 8 41 1000 15 YL230C 30b 230 29 6 7 76 37 0 8 40 1000 15 YL225C 30b 225 29 4 7 66 36 4 8 39 1000 15 PANDA 48 Cell Series YL215C...

Page 10: ...0 38 07 967 43 31 1100 3 94 100 2 17 55 3 94 100 3 94 100 A A A A 38 98 990 37 24 946 1 97 50 22 72 577 16 02 408 77 56 1970 22 72 577 77 56 1970 47 24 1200 3 94 100 Grounding holes 6 0 236 6 Mounting...

Page 11: ...AR AND SIDE VIEW DIMENSIONS OF MODULE SERIES UNITS INCH mm PANDA 48 Cell SERIES PANDA 60 Cell SERIES Legend Legend Grounding holes Mounting holes Drainage holes Mounting tolerance PANDA 48 Cell PANDA...

Reviews: