5. INSTALLATION OF THE MACHINE
5.1 Preparation
5.1.1 The machine size and weight measurements, given the technical specification sheet.The ground, where the
machine will be placed, should be even, solid enough to bear the weight of the machine.
5.1.2 Please open the wooden package and get out the parts attentively.
5.1.3 Firstly doing montage of foot group (FIGURE 1-2 NO.34,39,81,82)
5.1.4 Connect the panel group as figure. (FIGURE 2 NO.95)
5.1.5 To connect the conveyor to machine you have requested,use the output flange plate (Figure 2.NO.41). To
adjust the height and uniformity of conveyor,please use the bolts on conveyor’s foot (Figure 1 NO.81) and feet
of table. (Figure 1 NO.39)
Summary of Contents for 300
Page 4: ...4 BOYUTLAR DIMENSIONS РАЗМЕРЫ ...
Page 5: ...5 PARÇA LİSTESİ PART LIST ПЕРЕЧЕНЬ ДЕТАЛЕЙ RESİM FIGURE РИСУНОК 1 ...
Page 6: ...6 RESİM FIGURE РИСУНОК 2 ...
Page 25: ...25 ÇALIŞMA OPERASYONU ...
Page 54: ...54 WORKING OPERATION ...
Page 82: ...82 РАБОЧАЯ ОПЕРАЦИЯ ...
Page 95: ...95 ELECTRICAL DİAGRAM ...
Page 96: ...96 ELECTRICAL DIAGRAM SHEET 1 ...
Page 97: ...97 ELECTRICAL DIAGRAM SHEET 2 ...
Page 98: ...98 ELECTRICAL DIAGRAM SHEET 3 ...
Page 99: ...99 ELECTRICAL DIAGRAM SHEET 4 ...
Page 100: ...100 ELECTRICAL DIAGRAM SHEET 5 ...
Page 101: ...101 ELECTRICAL DIAGRAM SHEET 6 ...