The air conditioning system is sent by the factory
with a pressure of 20 bar inside. While removing the
existing plugs at the connection points, it should be
checked whether there is Nitrogen gas in it.
Ø12 WATER HOSE
5/16 HOSE AND FITTING
CONNECTION
5/8 HOSE AND FITTING
CONNECTION
Ø12 WATER HOSE
Stage
4.4 Hoses and Fitting
For the water discharge hose connection, the
clamps must be tightened behind the stage in the
evaporator water discharge section as shown in the
figure. Water discharge hoses should be inclined at
least 2° so as not to interfere with the water flow.