
11
5000-035A ASSEMBLY INSTRUCTION
STEP 6:
Install each Push Rods into the Mount Bracket & attach to the Pivot Arms using 5/8” Shoulder Bolts,
5/8” Washers, & ½” Jam Lock Hex Nuts. Use the lower hole on the arm. The Washers are to be
installed on each side of the “EYE” on the Push Rod. Now install the Compression Springs, Spring
Bushings, & ¾”Lock Hex Nuts.
STEP 7:
Attach the Roller Mounts to the Overbearing Arms, & then install the ½” X 3 ¾” Bolts, Spacers, & ½”
Lock hex Nuts. Slide the Roller Mount Tubes side to side as needed to clear the end of the Corn Head.
NOTE:
Make sure the Bearing Support Tab in on the backside of the Bearing Mounting Plate.
2 ROW ROLLER ASSEMBLY
3 ROW ROLLER ASSEMBLY
STEP 8:
Install the Shim Washers & Bearings onto each side of the Roller. Attach the Roller/Bearing Assembly to
the Roller Mount Tube using ½” X 2 ½” Bolts & ½” Lock Hex Nuts. (
3 ROW ROLLER SHOWN
)
NOTE:
The side of the Bearing Protruding on the outside of the casting should face the Roller.
Summary of Contents for 5000-023B
Page 13: ...13 5000 023B PARTS IDENTIFICATION PART IDENTIFICATION TABLE ON THE FOLLOWING PAGE...
Page 14: ...14 5000 023B PARTS IDENTIFICATION...
Page 15: ...15 5000 024B PARTS IDENTIFICATION PART IDENTIFICATION TABLE ON THE FOLLOWING PAGE...
Page 16: ...16 5000 024B PARTS IDENTIFICATION...
Page 17: ...17 5000 035A PARTS IDENTIFICATION PART IDENTIFICATION TABLE ON THE FOLLOWING PAGE...
Page 18: ...18 5000 035A PARTS IDENTIFICATION...
Page 20: ...20 2565 784_REV_C 09 19...