background image

30.

31.

rebuild kits

part #

DesCriptiOn

Qty

h12s66a00000000000001 sB66a 2012 BearinG reBUilD kit

1

300020039

BearinG 40x52x7 6808 2rs max

1

300020040

BearinG 45x58x7 6809 2rs max

1

300020041

BearinG 15x24x7 3802 2rs max

2

300020042

BearinG 15x28x7 6902 2rs max

2

300020043

BearinG 17x30x7 7903 2rs max

2

300030016

BOlt sCkt heaD m6x1x16

4

300040429

O rinG QUaD 50.4x54x1.6

1

300040430

O rinG QUaD 56.8x60.4x1.6

1

h12s66a0000000000000

sB66a 2012 master reBUilD kit 

1

300020039

BearinG 40x52x7 6808 2rs max

1

300020040

BearinG 45x58x7 6809 2rs max

1

300020041

BearinG 15x24x7 3802 2rs max

2

300020042

BearinG 15x28x7 6902 2rs max

2

300020043

BearinG 17x30x7 7903 2rs max

2

300030062

washer (6.5x12.5x0.5mm)

1

300030110

BOlt ti male m6x1x12mm

3

300030111

BOlt ti Female 8x34mm

2

300030016

BOlt sCkt heaD m6x1x16

4

300030234

BOlt stOp m12x1.25x10mm

1

300030235

BUmper stOp

1

300030236

washer shOCk BOlt

4

300040423

axle main pivOt

1

300040424

axle link pivOt Upper

1

300040425

axle link pivOt lOwer

1

300040426

axle 45mm inteGrateD

1

300040427

link Uper allOy

1

300040428

Cap axle link

2

300040429

O rinG QUaD 50.4x54x1.6

1

300040430

O rinG QUaD 56.8x60.4x1.6

1

300040431

axle 40mm

1

h12s66a00000000000003 sB66a 2012 eCCentriC kit

1

300030062

washer (6.5x12.5x0.5mm)

1

300030110

BOlt ti male m6x1x12mm

1

300030234

BOlt stOp m12x1.25x10mm

1

300030235

BUmper stOp

1

300040426

axle 45mm inteGrateD

1

300040429

O rinG QUaD 50.4x54x1.6

1

300040430

O rinG QUaD 56.8x60.4x1.6

1

300040431

axle 40mm

1

h12s66a0000000000002

sB66a 2012 shOCk mOUntinG harDware

1

300030110

BOlt ti male m6x1x12mm

2

300030111

BOlt ti Female 8x34mm

2

300030236

washer shOCk BOlt

4

Summary of Contents for SB66 2013

Page 1: ...YETI CYCLES 600 Corporate Circle Unit D Golden CO 80401 888 576 9384 www yeticycles com owner smanual 2013yetisb66...

Page 2: ...Features 08 Geometery 10 Maintenance Schedule 12 setup overview 14 Shock Setup 15 Quick start guide 16 Cable Line Setup 18 technical Assembly Overview 20 chip system 26 Exploded Views 28 REBUILD KITS...

Page 3: ...ate every situation or condition that may occur during the assembly setup and maintenance of your bicycle Yeti recommends that all service and repairs be performed by your local authorized Yeti Dealer...

Page 4: ...t 6 The SB66 uses a 2 5 inch stroke 8 5 inch eye to eye shock by Fox Racing Shox Mount an air or coil version on the SB66 depending on your riding style 7 The Yeti chip system allows for an easy switc...

Page 5: ...13 5 13 5 13 5 H 27 9 28 3 29 4 30 2 I 4 90 4 90 5 50 6 30 J 20 8 20 8 20 8 20 8 K 1 5 1 5 1 5 1 5 Small 5 3 160 CM 5 7 171 CM Medium 5 7 171 CM 5 11 180 CM Large 5 11 180 CM 6 3 191 CM X large 6 3 19...

Page 6: ...in the step by step assembly instructions later in the manual For general bicycle maintenance please consult the torque specifications of the manufacture s component you are adjusting Clean and lube...

Page 7: ...ure Once you have set your baseline air pressure you need to measure the sag To measure the sag slide the travel indicator O Ring up against the shock body With a friend supporting the bike sit on the...

Page 8: ...king the shock feel stiffer under low speed compressions Turning the dial counter clockwise will decrease low speed compression damping making the shock feel softer under low speed compressions Please...

Page 9: ...sh The rear brake line loops across the head tube and runs down the cable stops on the top of the down tube Use zip ties to secure the line to the position closest to the non drive side on the cable g...

Page 10: ...len keys Two 6mm allen keys Guide pin tool Grease Blue loctite Place the 54mm OD quad o ring by the drive side main pivot bearing The o ring should be flush with the bearing Repeat the process with th...

Page 11: ...e shaft of the lower link pivot axle Prepare the threads of the axle with blue loctite Insert the axle through the link and tighten with a 6mm allen key Torque to 90 95 in lb 05 06 08 07 Slide the rea...

Page 12: ...lts to 90 95 in lb Grease the upper link pivot axle and install it through the swingarm and the upper link bearings from the drive side of the frame Use a dead blow hammer to tap the pin into place Ap...

Page 13: ...insert them into the drive cap through the swingarm and into the hanger Fit the 12MM non drive insert into the groove on the inside of the non drive side chainstay The insert should be flush with the...

Page 14: ...20040 bearing 6809 2rs max 1 14 300020039 bearing 6808 2rs max 1 15 300020041 bearing 3802 2rs max 2 16 300020042 bearing 6902 2rs max 2 17 300020043 bearing 7903 2rs max 2 18 300030234 bolt stop m12x...

Page 15: ...male m6x1x12mm 3 300030111 bolt ti female 8x34mm 2 300030016 bolt sckt head m6x1x16 4 300030234 bolt stop m12x1 25x10mm 1 300030235 bumper stop 1 300030236 washer shock bolt 4 300040423 axle main pivo...

Page 16: ...nclude the cost of travel or shipment to and from an authorized Yeti dealer In order to exercise your rights under these limited warranties the bicycle or frameset must be presented to an authorized Y...

Reviews: