background image

YETI CYCLES 
600 Corporate Circle, Unit D 
Golden, CO 80401 
888.576.9384 
 
www.yeticycles.com

owner’s manual 

2013

 yeti sb

66

  

Summary of Contents for SB66 2013

Page 1: ...YETI CYCLES 600 Corporate Circle Unit D Golden CO 80401 888 576 9384 www yeticycles com owner smanual 2013yetisb66...

Page 2: ...Features 08 Geometery 10 Maintenance Schedule 12 setup overview 14 Shock Setup 15 Quick start guide 16 Cable Line Setup 18 technical Assembly Overview 20 chip system 26 Exploded Views 28 REBUILD KITS...

Page 3: ...ate every situation or condition that may occur during the assembly setup and maintenance of your bicycle Yeti recommends that all service and repairs be performed by your local authorized Yeti Dealer...

Page 4: ...t 6 The SB66 uses a 2 5 inch stroke 8 5 inch eye to eye shock by Fox Racing Shox Mount an air or coil version on the SB66 depending on your riding style 7 The Yeti chip system allows for an easy switc...

Page 5: ...13 5 13 5 13 5 H 27 9 28 3 29 4 30 2 I 4 90 4 90 5 50 6 30 J 20 8 20 8 20 8 20 8 K 1 5 1 5 1 5 1 5 Small 5 3 160 CM 5 7 171 CM Medium 5 7 171 CM 5 11 180 CM Large 5 11 180 CM 6 3 191 CM X large 6 3 19...

Page 6: ...in the step by step assembly instructions later in the manual For general bicycle maintenance please consult the torque specifications of the manufacture s component you are adjusting Clean and lube...

Page 7: ...ure Once you have set your baseline air pressure you need to measure the sag To measure the sag slide the travel indicator O Ring up against the shock body With a friend supporting the bike sit on the...

Page 8: ...king the shock feel stiffer under low speed compressions Turning the dial counter clockwise will decrease low speed compression damping making the shock feel softer under low speed compressions Please...

Page 9: ...sh The rear brake line loops across the head tube and runs down the cable stops on the top of the down tube Use zip ties to secure the line to the position closest to the non drive side on the cable g...

Page 10: ...len keys Two 6mm allen keys Guide pin tool Grease Blue loctite Place the 54mm OD quad o ring by the drive side main pivot bearing The o ring should be flush with the bearing Repeat the process with th...

Page 11: ...e shaft of the lower link pivot axle Prepare the threads of the axle with blue loctite Insert the axle through the link and tighten with a 6mm allen key Torque to 90 95 in lb 05 06 08 07 Slide the rea...

Page 12: ...lts to 90 95 in lb Grease the upper link pivot axle and install it through the swingarm and the upper link bearings from the drive side of the frame Use a dead blow hammer to tap the pin into place Ap...

Page 13: ...insert them into the drive cap through the swingarm and into the hanger Fit the 12MM non drive insert into the groove on the inside of the non drive side chainstay The insert should be flush with the...

Page 14: ...20040 bearing 6809 2rs max 1 14 300020039 bearing 6808 2rs max 1 15 300020041 bearing 3802 2rs max 2 16 300020042 bearing 6902 2rs max 2 17 300020043 bearing 7903 2rs max 2 18 300030234 bolt stop m12x...

Page 15: ...male m6x1x12mm 3 300030111 bolt ti female 8x34mm 2 300030016 bolt sckt head m6x1x16 4 300030234 bolt stop m12x1 25x10mm 1 300030235 bumper stop 1 300030236 washer shock bolt 4 300040423 axle main pivo...

Page 16: ...nclude the cost of travel or shipment to and from an authorized Yeti dealer In order to exercise your rights under these limited warranties the bicycle or frameset must be presented to an authorized Y...

Reviews: