Insert the lightly greased upper link pivot axle nut
(300030286) into the keyed hole in the swingarm
and, using a 5mm allen wrench, thread the
pivot axle into the nut. Using a piece of foam or
bubble wrap behind the link will help protect your
paint until the shock is installed.
*Torque to 3 Nm
24.
25.
Insert the lightly greased main pivot axle nut
(300030285) into the corresponding keyed hole
in the swingarm and thread the main pivot collet
axle into it. Using a 10mm allen wrench, tighten
the main pivot collet axle.
*Torque: 3.5 Nm
Place the bearing race extender washers
(300020049) on the upper link bearings. There
should be just enough grease there to hold the
washers in place.
Grease the upper link pivot collet axle
(300040484). Push the pivot axle through the
swingarm and the upper link bearings from the
non drive side. You may want to use a guide pin
to help align the bearing spacer. (
NOTE: Ignore
the Loctite in the image, use grease)
13.
14.
15.
16.
ASSEMBLY
Slide the swingarm over the infinity link and insert
the main pivot collet axle from the non drive side.
You may need to use a guide pin from the drive
side to help align the bearing spacer in the link.
ASSEMBLY
17.
Grease and install the main pivot collet wedge
with a 5mm allen wrench. Be sure to grease both
the threads and the collet wedge.
*Torque to 14 Nm
18.
Grease and install the upper link collet wedge
with a 4mm allen wrench. Be sure to grease both
the threads and the collet wedge.
*Torque: 8 Nm
19.
Slide the rear of the shock into the swingarm,
align the shock eyelet and secure with a guide
pin. (200020118)
20.
Summary of Contents for SB5+
Page 1: ...OWNER S MANUAL YETISB5 ...