English-
34
OPERATION
Moving by Hand
When pushing or pulling the mower, be sure
to engage the IZT (Integraded Zeroturn
Transaxle) bypass linkages. The IZT bypass
linkages are located on the rear of the frame,
below the rear engine guard.
•
Raise the deck into the highest cutting
position.
•
Release the park brake prior to engaging
bypass linkages.
•
Pull the IZT bypass linkages out and put
them into the slots so that it is held in the
bypass position.
•
To re-engage the IZT’s to drive, reverse
the above procedure.
•
Load onto truck or trailer by driving up
ramps in low gear. Do not lift! This
machine is not intended to be lifted by
hand,
CZ10-2
1. IZT Bypass linkage
Bypass linkages
CZ12
1. Head outside of rear deck
2. IZT Bypass linkage in bypass position
Bypass position
1
2
Summary of Contents for ZEKW48190
Page 2: ......
Page 73: ...English 71 SERVICE JOURNAL After the First 5 8 Hours 1 Change engine oil...
Page 79: ...English 77 SERVICE JOURNAL Action Date mtr reading stamp sign...
Page 80: ...English 78 SERVICE JOURNAL Action Date mtr reading stamp sign...
Page 81: ...English 79 SERVICE JOURNAL Action Date mtr reading stamp sign...
Page 82: ......
Page 83: ......
Page 84: ......