English-
35
MAINTENANCE
Maintenance
Maintenance Schedule
The following is a list of maintenance procedures that must be performed on the machine. For those points
not described in this manual, visit an authorized service workshop. An annual service carried out by an
authorized service workshop is recommended to maintain your machine in the best possible condition and
to ensure safe operation.
Read “Maintenance” section in the “Safety Instructions” section.
1)
First change after 5-8 hours. When operating with a heavy load or at high ambient temperatures, replace every 50 hours.
2)
In dusty conditions,
cleaning and replacement are required more often.
3)
For daily use, the machine should be lubricated twice weekly.
4)
Performed by authorized service
workshop.
z
= Described in this manual
= Not described in this manual
Daily
mainte-
nance
Weekly
mainte-
nance
At
least
once
each
year
Maintenance interval
in hours
Maintenance
Page Before After
25
50
100
300
Check the parking brake
54
z
Check the engine’s oil level (every refueling)
58
z
Check the safety system
39
z
Check for fuel and oil leakages
-
Check/clean the engine’s cooling air intake
40
z
Check the mower deck
46
z
Check hardware (screws, nuts, etc.)
50
z
Clean under the mower deck
50
z
Start the engine and blades, listen for unusual
sounds
-
Check for damage
-
Thoroughly clean around the engine
-
Clean around belts, belt pulleys, etc.
-
Check the tire pressures
42
z
Check battery
37
z
Sharpen/Replace mower blades
46
z
Check the fuel pump’s air filter
2)
42
z
Clean the engine’s cooling air intake
2)
40
z
z
Clean the air cleaner’s pre-filter
2)
(foam)
41
z
z
Clean the air cleaner’s filter cartridge
2)
(paper filter)
41
z
z
Check/adjust the parking brake
-
Inspect muffler/Spark arrester
-
Summary of Contents for ZEKW42170
Page 2: ......
Page 71: ...English 69 SERVICE JOURNAL After the First 5 8 Hours 1 Change engine oil...
Page 77: ...English 75 SERVICE JOURNAL Action Date mtr reading stamp sign...
Page 78: ...English 76 SERVICE JOURNAL Action Date mtr reading stamp sign...
Page 79: ...English 77 SERVICE JOURNAL Action Date mtr reading stamp sign...
Page 80: ......