3.3 Commissioning
CAUTION!
–
Before commissioning the device must be brought to room tempera-
ture.
–
At condensation the device must be absolutely dry before connected
to power.
–
To avoid overheat during operation the device must not be laid open
to direct sun light.
–
After opening the control cabinet or desk, there are parts with pos-
sible dangerous voltage available.
–
For all signal connections only screened cables are permitted.
–
Signal cables must not be let within the same cable shaft as high
voltage cables.
3.3.1 VIPA Startup-Manager
As soon as the Touch Panel is provided by power supply, the
VIPA Startup-Manager
will
be loaded. At the first startup of the
VIPA Startup-Manager
the following
start screen
appears.
n
There is a button on the
initial screen
with a counter, which counts backwards. If you
click on this button within this time, you can return to the
selection menu
. If the time
expires, the project will start automatically.
n
A delay time of 5 seconds is default. In the
selection menu
at "Autostart" you can
adjust this time.
There are following buttons in the
selection menu
:
n
Settings
n
Info/Update
n
Autostart
n
Exit
n
Back
Start screen
Selection menu
VIPA HMI
Deployment under Windows CE 6.0 Core
Commissioning > VIPA Startup-Manager
HB160 | TP-ECO | 62K-NHC0 | en | 17-09