![YASKAWA PVI 23 TL Installation And Operation Manual Download Page 40](http://html1.mh-extra.com/html/yaskawa/pvi-23-tl/pvi-23-tl_installation-and-operation-manual_3484906040.webp)
PVI 23TL, 28TL Installation and Operation Manual (Rev J)
DOCR-070365-J
Page
39
of
66
7.2
Connecting TL Inverters using SolrenView Monitoring Option
Solectria offers SolrenView monitoring as an option for the PVI 23-28TL inverters. In Gen III PVI
23-28TL inverters, SolrenView hardware is no longer an integrated option, only external. This
option (SRV-LCD-3PTL-OUTDOOR) includes the SolrenView data logger which comes in an
outdoor rated enclosure. The SolrenView logger is used to connect the TL inverters to the
Solectria SolrenView web-based monitoring site.
In Gen III the SolrenView gateway cannot be factory installed inside of the inverter.
Figure 7.7 – High Level Block Diagram of the SolrenView Data Acquisition Infrastructure
Figure 7.8 – Multiple Inverters with SolrenView Data Logger
NOTE:
The SolrenView data logger in Figure 7.8 is installed next to the first
inverter. This is a typical installation.