4 Start-Up Programming
YASKAWA
TOEPYAIL1E01A YASKAWA AC Drive L1000E Quick Start Guide
111
St
ar
t-
Up
Pr
og
ra
m
m
in
g
4
Refer to the following table to install the inrush current suppression circuit for battery.
Table 31 Installation of the Inrush Current Suppression Circuit for Battery
Voltage
<1> Select the appropriate relay referring to the following calculation even if the battery voltage or main power current is applied.
Drive Model
CIMR-LE
Resistor
Relay
200 V
2A0269
1.0
Ω
, 80 W
2A0354
1.0
Ω
, 80 W
2A0432
1.0
Ω
, 80 W
400 V
4A0188
1.0
Ω
, 120 W
4A0225
1.0
Ω
, 220 W
4A0260
1.0
Ω
, 220 W
Load current of battery (A) =
Motor rated power (kW)
×
Operation frequency when running battery (Hz)
×
2
×
1000
Battery voltage (Vdc)
×
0.6 (Motor efficiency)
×
Motor rated frequency (Hz)
Y E A _ c o m