Planning is Essential
• Consider soil conditions, slopes, utility locations
and property lines when positioning posts.
• Run a string line to locate the fence line and
establish the outside faces of your posts
(See Fig 1.)
• Mark the centers of the post locations for
your fence. The maximum
on center
distance between fence rail posts is 7
2
".
Fig 1.
Sample Staking & Post Layout
A B
C D E F
Stake
String
7
2
"
On-Center
Distance
Post
Belmont White Lattice Top Fence
(6 x 6) Installation Instructions
For SKU# 1728615
Required:
• Philips Screwdriver
• Measuring Tape
• String Line, Stakes, Level
• PVC Vinyl Cement (Menards
#172-4587)
•
Concrete or Gravel
Optional:
• Power Drill with 1/8" Drill Bit
• Post Hole Digger
• Power Auger
• Safety Glasses
Installation Tips:
• Prior to construction, check with your regulatory agency for local code requirements
• Contact your utility company to locate and mark underground lines
• Careful planning and measurement of your fence project is essential, as moving posts
after the concrete sets is extremely difficult
• It is highly recommended to measure the panels prior to setting your posts,
not all panels are the same width (+/- 3/16")
*These components are pre-assembled
Item
Product Name
Qty
4" x 4" Vinyl Post
4" x 4" Post Cap
Rail Bracket
Screw
U Channel
Top Mid Bottom Rail
*
A
B
C
D
E
F
G
H
G
H
H
1
Lattice*
Fence Panel*
1
6
48
2
3
1
9
A,B,C & D included in Post Kit #'s 1728602(White)
sold separately.