background image

6

GB-IE

BEFORE STARTING, READ THROUGH THE ASSEMBLY INSTRUCTIONS CAREFULLY.

CHECK THOROUGHLY ALL THE PARTS YOU HAVE RECEIVED AGAINST THE PARTS DIAGRAMS 

PAGES 1-3.

ENSURE THAT NO PARTS ARE DAMAGED.

ALWAYS ASSEMBLE THE ROOF FIRST, ESPECIALLY IF YOU 

DO NOT INTEND TO COMPLETE CONSTRUCTION ON THE 

SAME DAY.

DO NOT ERECT YOUR BUILDING ON A WINDY DAY. ANY 

BUILDING LEFT PARTIALLY CONSTRUCTED MAY BE 

DAMAGED.

ALL ASSEMBLY OPERATIONS MUST TAKE PLACE ON A 

LEVEL SURFACE.

WASHERS TO BE USED ON ALL SCREWS

THE SHED SHOULD BE SECURELY ANCHORED TO A FIRM 

LEVEL BASE EG CONCRETE, PAVING SLABS OR WOOD. 

CONCRETE SHOULD BE LAID A MINIMUM OF 75MM THICK AT 

APPROX. 25MM ABOVE GROUND LEVEL. A SHEET OF HEAVY 

DUTY POLYTHENE PLACED UNDER THE BASE AREA WILL 

HELP PREVENT DAMPNESS RISING FROM THE GROUND 

INTO THE SHED.

GB-IE

IT IS RECOMMENDED THAT YOU WEAR GLOVES WHEN ASSEMBLING THIS PRODUCT

TWO PERSON OPERATION

KEEP CHILDREN AWAY DURING ASSEMBLY

SAFETY

YOU WILL NEED

Before you start... / Safety

GB-IE

CHECK

Summary of Contents for 65 TYZ

Page 1: ...Email info yardmaster co uk Demandes de Reseignements TRIGANO JARDIN Service Commercial Usine Du Boulay 41170 Cormenon Mondoubleau Tel 02 54 73 55 55 Fax 02 54 73 55 61 Email Sav Amca trigano fr Bitte...

Page 2: ...1 1700mm 1700mm 1700mm...

Page 3: ...2...

Page 4: ...3...

Page 5: ...e errichtet werden Scheiben f r Verwendung mit allen Schrauben Das Ger tehaus mu auf einer festen ebenen Fl che verankert werden z B auf Beton Betonplatten Holz Die Betonplattform soll mindestens 75mm...

Page 6: ...TAGE DOIVENT TRE R ALIS ES SUR UNE SURFACE PLANE UTILISEZ LES RONDELLES AVEC TOUTES LES VIS L ABRI DOIT TRE FIX AU SOL SUR UNE SURFACE PLANE PAR EXEMPLE BETON DALLES EN BETON BOIS ETC LE BETON DOIT TR...

Page 7: ...DAMAGED ALL ASSEMBLY OPERATIONS MUST TAKE PLACE ON A LEVEL SURFACE WASHERS TO BE USED ON ALL SCREWS THE SHED SHOULD BE SECURELY ANCHORED TO A FIRM LEVEL BASE EG CONCRETE PAVING SLABS OR WOOD CONCRETE...

Page 8: ...7 Schritt 1 Etape 1 Step 1 Montage Assemblage Assembly Giebel Pignons Gables...

Page 9: ...8 Giebel Vorne Pignon Avant Front Gable GIEBEL VORNE PIGNON AVANT FRONT GABLES...

Page 10: ...9 Dachrahmen Ossature du toit Roof frame...

Page 11: ...10 Regenrinne Goutti res Gutters...

Page 12: ...R DACHPANEELE EQUARREZ LE METIER AVANT DE FIXER LES PANNEAUX ENSURE ROOF FRAME IS SQUARE BEFORE SECURING PANELS SCHRAUBE HERAUSZIEHEN REMOVE TEMPORARY SCREWS Schritt 2 Etape 2 Step 2 Dachmontage erg n...

Page 13: ...12 Dachmontage erg nzen Assemblage complet de la toiture Complete roof assembly...

Page 14: ...13 Firstverkleidung Fa ti re Ridge cover VORNE VORNE DEVANT FRONT VORNE DEVANT FRONT...

Page 15: ...14 Firstverkleidungskappen Chape Fa ti re Ridge cover caps Regenrinnekappen Embouts goutti res Gutter end caps...

Page 16: ...15 Schritt 3 Etape 3 Step 3 Grundleisten Rails de base Base Rails VORNE DEVANT FRONT VORNE DEVANT FRONT...

Page 17: ...16 Dach auf den wanden stellen und befestigen Lever le toit sur les murs et fixer correctement Lift roof onto walls and secure...

Page 18: ...17 Schritt 4 Etape 4 Step 4 Wandpaneele Panneaux muraux Wall panels VORNE DEVANT FRONT...

Page 19: ...Schritt 5 Etape 5 Step 5 T rpfosten Montants de porte Door posts 18...

Page 20: ...19 Schritt 6 Etape 6 Step 6 T re Portes Doors INNENSEITE A L INTERIEUR INSIDE VIEW INNENSEITE A L INTERIEUR INSIDE VIEW...

Page 21: ...20 Schritt 7 Etape 7 Step 7 Montage der T re Montage des portes Fitting Doors...

Page 22: ...21 Einstellung der T re R glage des portes Door adjustment...

Page 23: ...22 Schritt 8 Etape 8 Step 8 Verankerung Ancrage de l abri Anchoring the shed BEUTEL NR 5 PLASTIK AUFSTECKH TCHEN F R DIE SCHRAUBENSPITZEN AN DEN INNENWANDEN...

Page 24: ...23...

Reviews: