background image

BUILDING CONTENTS

 

2918

1703

1207

1680

500

692

415

375

373

2315

655

435

Veranda Rail

Glazed
Side Window

Fornt Gable
Glazing

Side WIndow beading

Front Glazing Beading

Side WIndow Beading

Support Bar Block
10&12 models only

12x8 Roof Support 

10x8 Roof Support

Door Beading

Door Head Beading

Corner strips

Fascia

Door Block

03WES0808PS

03WES1008PS

03WES1208PS

03WES0808WS

03WES1008WS

03WES1208WS

03WES0808F

03WES1008F

03WES1208F

03WES0808R

03WES1008R

03WES1208R

Veranda Floor

03WES0808PG

03WES0808VR

03WES0808V

Veranda Upright

1705

Tower Bolt Mount

140

Height x Width x Depth

2330mm x 2413mm x 3725mm (12’x8’)
2330mm x 2413mm x 3125mm (10’x8’)
2330mm x 2413mm x 2510mm (8’x8’)

This building should be 

erected by two people.

For ease of assembly, it is 

advisable to pilot drill all

screw holes and ensure all

screw heads are countersunk.

WINTER = HIGH MOISTURE = EXPANSION

SUMMER = LOW MOISTURE = CONTRACTION

Drill

2mm bit

x2

CARE & USE

WOOD TREATMENT  All buildings will need treating with a good quality preservative / 

treatment prior to or during assembly and retreated annually. Preservative / treatments 

are available in a choice of colours and is left to the customers preference. 

Varnish is not recommended.

NATURAL MOVEMENT OF TIMBER THROUGHOUT THE SEASON Timber is a natural 

material and will, during the year pick up moisture in damp periods and dry out 

during hot spells. There will be constant expansion and contraction of the timbers 

which will be particularly noticeable during the dry periods as the boards will shrink,  

this is why all buildings have slight tolerances built into them.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment.

TYPES OF BASE

 

Concrete 75mm laid on top of 75mm hard-core.

 

Slabs laid on 50mm of sharp sand.

round.  The base should be slightly smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a 

Before you start

- Tools required for installation (Not Supplied)

- Drill & 2mm drill bit, Hammer, Spirit level, Measuring tape, Screwdriver (Phillips), 

Stanley knife, Wood Saw & Step Ladder

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand, 

plenty of space and a clean dry area for assembly. 

For Assistance Please 

Contact Customer Care on :-

01636 880514

Base Required

Specification

Your instructions should be read carefully before commencing assembly. 

Dispose of all packaging and plastic bags safely. Retain instructions for 

safety advice for future reference. Note: plastic bags can be harmful to small children.

If any parts have been 

damaged during the assembly of 

the building, replacement parts 

can be ordered through our 

customer care centre 

and will 

carry a 

minimum charge

.

Call Customer Care on :-

01636 880514

Sussex Summerhouse

2413mm

(10’x8’) 3125mm

(8’x8’) 2510mm

(12’x8’) 3725mm

Door 

Door Strip

800

03WES0808DG

Reviews: