background image

 8 

[email protected]

36 x 139.7 x 762mm

Y50119-237

2pc. (237) - 

Arch Gusset Right Long  2 x 6 x 30" - Box 1

36 x 139.7 x 762mm

Y50119-236

2pc. (236) - 

Arch Gusset Left Long  2 x 6 x 30" - Box 1

36 x 127 x 453.2mm

Y50119-193

2pc. (193) - 

Arch Gusset Right  2 x 5 x 17-27/32" - Box 3

38.1 x 139.7 x 266.7mm

Y50119-069

4pc. (069) -

 Beam End 10-1/2"  2 x 6 x 10-1/2" - Box 3

Y50119-194

2pc. (194) - 

Arch Gusset Left  2 x 5 x 17-27/32" - Box 3

38.1 x 69.9 x 408.9mm

Y50119-191

8pc. (191) - 

Bottom Brace Insert  2 x 4 x 16-1/8" - Box 3

38.1 x 76.2 x 409.6mm

Y50119-189

8pc. (189) - 

Cross Brace Insert  2 x 4 x 16-1/8" - Box 3

Y70119-241

8pc. (241) - 

Engineered Panel Post Long  2 x 4 x 97" - Box 2

53.5 x 69.9 x 2463.8mm

Y70119-239

8pc. (239) - 

Engineered Panel Corner Post Long  2 x 4 x 97"  - Box 2

38.1 x 63.5 x 1699.7mm

Y50119-233

9pc. (233) - 

Trellis End Short  2 x 3 x  66 15/16" - Box 2

38.1 x 63.5 x 2554.8mm

Y50119-232

9pc. (232) - 

Trellis End Long  2 x 3 x 100 -5/8 - Box 1

Y50119-183

64pc. (183) -  

X

 

Insert

  

2 x 2 x  22-5/8" - Box 1,2,3

36 x 69.9 x 2463.8mm

38.1 x 38.1 x 409.6mm

38.1 x 38.1 x 574.7mm

36 x 127 x 453.2mm

Y50119-185

Part Identification (                                                                          )

 

Dimensions are approximate and are shown to assist in the identification of parts for 

assembly.  Actual dimensions may be smaller or larger.

32pc. (185) - 

Horizontal Insert  2 x 2 x 16-1/8" - Box 1

Summary of Contents for YM11700

Page 1: ...Customer Support 1 888 509 4382 info yardistrystructures com www yardistrystructures com Yardistry Selwood Products Europe Customer Support 44 1284 852569 parts selwoodproducts com www selwoodproduct...

Page 2: ...o close to a Yardistry structure Consult user s manual of the grill fire pit or chimnea for safe distances from combustible materials Wear gloves to avoid injury from possible sharp edges of individua...

Page 3: ...not limited to wind storms hail floods excessive water exposure Minor twisting warping checking or any other natural occurring properties of wood that do not affect performance or integrity Yardistry...

Page 4: ...h of use and then annually Do not over tighten as to cause crushing and splintering of wood Check for sharp edges or protruding screw threads add washers if required WOOD PARTS Unprotected they will a...

Page 5: ...mounting to concrete footers see below for the correct locations and placement Please double check for possibility of any underground utilities such as gas telephone cable or sprinkler lines Followin...

Page 6: ...te Patio min 10 2 x 10 2 with 12 clearance on all sides Wood Deck min 10 2 x 10 2 with 12 clearance on all sides 10 x 1 1 4 Pan Screws Included 10 x 1 1 4 Pan Screws Included Anchoring Hardware not in...

Page 7: ...67 End Plinth Assembly 032 Short Plinth A Assembly 035 Arch Gusset Left Long 236 Long 237 Arch Gusset Right 194 Arch Gusset Right 193 Bottom Brace Insert 191 Engineered Panel Corner Post Long 239 Cros...

Page 8: ...pc 189 Cross Brace Insert 2 x 4 x 16 1 8 Box 3 Y70119 241 8pc 241 Engineered Panel Post Long 2 x 4 x 97 Box 2 53 5 x 69 9 x 2463 8mm Y70119 239 8pc 239 Engineered Panel Corner Post Long 2 x 4 x 97 Box...

Page 9: ...Actual dimensions may be smaller or larger 38 1 x 139 7 x 527 1mm Beam 20 3 4 2 x 6 x 20 3 4 Box 3 4pc 067 Y50119 067 38 1 x 241 3 x 3048 0mm Arch Beam Centre Box 3 2pc 079 Y50119 079 34 9 x 152 4 x...

Page 10: ...o assist in the identification of parts for assembly Actual dimensions may be smaller or larger 113pc S24 Wood Screw 10 x 4 Y06427 940 90pc S3 Wood Screw 8 x 2 1 2 Y06427 522 20pc FW2 5 16 Flat Washer...

Page 11: ...05 1 pc Beam Hanger 4 Pk Y70819 011 8pc L Mount Left Y00419 004 Dimensions are approximate and are shown to assist in the identification of parts for assembly Actual dimensions may be smaller or large...

Page 12: ...es or sprinkler line locations prior to excavating any holes D Before you discard your cartons fill out the form below The carton I D stamp is located on the end of each carton Please retain this info...

Page 13: ...1 x 38 1 x 574 7 mm Hardware Wood Parts Fig 2 1 32 x X Insert Pin A Place one X Insert Pin into one X Insert then attach a second X Insert to form a complete Insert Make sure the pieces are tight to...

Page 14: ...od Screws as shown in fig 3 1 C Set one 185 Horizontal Insert between the posts and tight to Bottom Brace Insert Attach with two 8 x 3 Wood Screw as shown in figure 3 1 32 x 8 x 3 Wood Screw 241 Engin...

Page 15: ...board should be a 189 Cross Brace Insert Attach all three Horizontal Inserts with two 8 x 3 Wood Screws per insert and attach 189 Cross Brace Insert with four 8 x 3 Wood Screws fig 3 3 80 x 8 x 3 Woo...

Page 16: ...pre drill two holes from the inside at the places shown in fig 4 1 and 4 2 Pre drill in the centre of the panel and on a slight angle Fig 4 2 Note Only pre drill one post per assembly Fig 4 1 pre dril...

Page 17: ...2463 8 mm Fig 4 3 B Through the pre drilled holes attach two Panel Posts assemblies to one 235 Corner Post Long with one 10 x 4 Wood Screw per Panel Post Assembly at bottom and six 8 x 2 1 2 Wood Scre...

Page 18: ...h two 10 x 1 1 4 Pan Screw per L Mount as shown in fig 5 1 5 2 and 5 3 Step 5 Attach L Mount Brackets Fig 5 1 Fig 5 2 Hardware 16 x Room L Mount Right and Left 32 x 10 x 1 1 4 Pan Screw 10 x 1 1 4 Pan...

Page 19: ...er Post Assembly Part 1 A Place one 034 Short Plinth B Assembly with one 035 Short Plinth A Assembly tight to each other and attach using two 6 x 30 mm Trim Screw at the opposite corners per Plinth Fi...

Page 20: ...ch Plinths to Corner Post Assembly Part 2 B On the outside of the corner post assembly place two 033 Long Plinth Assembly tight against each other using 2 6 x 30 mm Trim Screws per Plinth Be sure they...

Page 21: ...End Plinth Assembly Step 6 Attach Plinths to Corner Post Assembly Part 3 C Place one 032 End Plinth Assembly onto each Corner Post Assembly Line them up with previously placed Plinths Make sure they a...

Page 22: ...lined up flush and level before installing remaining screws D After the End Plinth have been placed go back and install the two remaining 6 x 30 mm Trim Screws per end to the assembled Plinth of the...

Page 23: ...four complete Corner Post Assemblies so they form a rectangle as shown in fig 7 1 See figure 7 1 and 7 2 for accurate placements and additional measurements Fig 7 2 C Depending on what you are placing...

Page 24: ...ce attach one 069 Beam End 10 1 2 to 192 Beam End 34 1 4 with three 10 x 4 Wood Screws as shown in fig 8 1 B Repeat Step A three more times so you have four assemblies Note that two of the Beam Ends s...

Page 25: ...r 5 16 lock washer 5 16 t nut 4 x 5 16 x 5 Hex Bolt 5 16 flat washer 5 16 lock washer 5 16 t nut 234 Beam 105 1 2 Beam End Assembly Fig 9 1 8 x 3 Wood Screw 5 16 Flat Washer 5 16 x 5 Hex Bolt Beam End...

Page 26: ...16 t nut per side fig 10 1 B Attach three 8 x 3 wood screws per side C Repeat for the opposite side Step 10 Attach Arch Beam Fronts 2 x 195 Arch Beam Front 38 1 x 241 3 x 3048 mm 2 x 6 x 120 Hardware...

Page 27: ...attach with one 8 x 2 1 2 Wood Screw and six 10 x 4 Wood Screws per Beam 20 3 4 as shown in fig 11 1 and 11 2 Step 11 Attach Arch Beam Offsets 2 x 080 Arch Beam Offset 38 1 x 241 3 x 3048 mm 4 x 067...

Page 28: ...anger fig 12 1 12 2 B Repeat Step A for second 079 Arch Beam Centre fig 12 2 Step 12 Attach Arch Beam Centres Part 1 2 x 079 Arch Beam Centre 38 1 x 241 3 x 3048 mm Hardware Wood Parts Fig 12 2 44 x 1...

Page 29: ...x 4 Wood Screws per side fig 12 3 12 4 D Repeat Step C for second 079 Arch Beam Centre fig 12 4 Step 12 Attach Arch Beam Centres Part 2 Hardware Fig 12 4 12 x 10 x 4 Wood Screw Fig 12 3 079 Arch Beam...

Page 30: ...ave T Nut Installed A Leaving the T nut installed remove the 5 16 x 6 Hex Bolt 5 16 lock washer and 5 16 flat washer from each Beam End Assembly installed in Step 9 fig 13 1 13 2 Step 13 Attach Suppor...

Page 31: ...ng cut outs of 231 Support Beams to 234 Beam 105 1 2 as shown in fig 13 5 Step 13 Attach Support Beams Part 2 Hardware Fig 13 4 Fig 13 3 Fig 13 5 Beam End Assembly 231 Support Beam 5 16 x 6 Hex Bolt p...

Page 32: ...231 Support Beams to 234 Beam 105 1 2 using sixteen 8 x 2 1 2 Wood Screws per side as shown in fig 13 6 13 7 Step 13 Attach Support Beams Part 3 Hardware Fig 13 7 32 x 8 x 2 1 2 Wood Screws Fig 13 6...

Page 33: ...g 14 2 C Repeat Steps A and B until there are 9 Trellis End Assemblies Step 14 Assemble Trellis Ends 9 x 232 Trellis End Long 38 1 x 63 5 x 2554 8 mm 9 x 233 Trellis End Short 38 1 x 63 5 x 1699 7 mm...

Page 34: ...d in fig 15 1 and 15 2 C Attach Trellis Clip to 079 Arch Beam Centre with two 10 x 1 1 4 Pan Screws as shown in fig 15 1 and 15 3 Step 15 Attach Trellis End Assemblies Part 1 Hardware 5 x 10 x 4 Wood...

Page 35: ...on opposing sides to the assemblies next to it fig 15 5 Note The distance between assemblies should be 12 fig 15 6 Note Refer to previous page fig 15 2 and 15 3 for attaching trellis clip Step 15 Atta...

Page 36: ...be opposing corners Attach a 193 Arch Gusset Right on the other two corners B Repeat for opposite side Step 16 Attach Left and Right Arch Gussets Part 1 193 Arch Gusset Right Fig 16 1 194 Arch Gusset...

Page 37: ...ood Screws as shown in fig 16 3 and 16 4 Each corner of the assembly should have one 237 Arch Gusset Right Long and one 236 Arch Gusset Left Long Fig 16 3 Hardware Wood Parts Fig 16 4 Step 16 Attach L...

Page 38: ...38 support yardistrystructures com NOTES...

Page 39: ...39 support yardistrystructures com NOTES...

Page 40: ...is product for ease of assembly Excellent Very Good Average Below Average Poor How would you rate our instructions Excellent Very Good Average Below Average Poor How would you rate the quality of pack...

Reviews: