Step 10.
Fasten the floorboards using 1 1/2” vinyl screws. (6E)
Step 11.
After the floor is finished assemble the railing section using 56”
2x6’s, corner brackets and 6 7/8” threaded rods.
Step 12.
Complete the main structure by fastening the corner brackets.
Use 1 3/4” washer head screws to fasten the top and bottom of
each bracket.
The ground brackets only get the tops fastened.
Step 9.
Locate the floorboards (1D) and lay them in place.
There are two short boards that go between the 4x4 posts
and one narrow board for the center.
Summary of Contents for Polaris
Page 17: ......