5
Continue fastening 2x6's to 4x4's using
6 7/8"
bolts.
Tighten nuts at this point. Over-tightening acorn nuts
can cause the head to pop off.
Install three floor joists.
Fasten joists to hangers using 1
3/4
" washer head
screws. Measure to ensure that tower is square at this
point.
6WHS
5
:
6WHS
8
:
6WHS
7
:
6WHS
6
:
Polaris Vinyl Playset
Assembly Manual