3
Elevated Garden Planter Assembly Manual
YardCraft.com [email protected] 171 Jalyn Drive New Holland PA 17557 1-844-442-1615
Repeat steps 1 and 2, to create a total of four Post
Assemblies.
Lay the Long Bottom Rail Boards and the Short Bottom
Rail Boards down on a flat surface. Align at the inside
corners. Fasten together at each corner with (2) 3”
Screws.
Set the Bottom Rail assembly from step 4 onto the post
supports.
Fasten the Post to the Bottom Rails at each corner with
(2) 2” Screws.
Step: 1
Step: 2
Step: 4
Step: 3
Step: 6
Step: 5
Place a Post Support between the two Post Boards.
Align with the end of the Post Boards and fasten
through pre-drilled holes with (4) 3/4” Screws. Be sure
not to cover the holes in the Post Boards.
Align Here
Pre-drilled Holes
Fasten the 1x4 Post Board onto the 1x3 Post Board with
1 5/8” Screws through pre-drilled holes. Make sure the
Post Boards are in the correct position. The two holes
need to be aligned as shown.
Align Here