6
(19)
Layout the flooring.
(21)
Attach the corner of the floor-
ing, using 2” nails.
(20)
Start on the front right corner
with the first piece, making sure
flooring is flush with perimeter.
NOTE:
Both pieces of flooring are
41-7/8”x84”
Install Flooring
(25)
Repeat previous steps for back
piece, using an 8” to 12” nail spac-
ing, and ensuring all flooring is ei-
ther flush or parallel with the floor
joists.
(26)
Finally, make sure flooring is
nailed to all floor joists, then you
are ready for wall placement.
(27)
Ready for walls! Refer to next
step.
(22)
Nail along the gable, making
sure flooring is flush with the floor
joist. Use an 8” to 12” nail spac-
ing.
(23)
Now; nail front left corner,
again; making sure flooring is
flush with the band board.
(24)
Before you finish attaching
the first row flooring to the joist,
make marks 12” on center for a
guide to adjust the joist when nail-
ing.
(866) 210-9273 - [email protected]