10 | RMB/ENERGIE GmbH
Installation and commissioning
Manual neoTower
®
Power Storage | (02/2022)
4. Installation and commissioning
4.1 Installation site requirements
The system may only be installed in compliance with
the following building requirements:
Fire protection:
►
The system must be installed in rooms with suitable
fire protection and without fire loads.
►
It is not permitted to install the system in potentially
explosive atmospheres.
Floor specifications:
►
The floor must have a firm surface
►
It must be level and clean.
Distances:
The following distances must be maintained to ensure
proper ventilation:
►
Distance behind the unit: 10 cm min.
►
Distance at the top of the unit: 10 cm min.
►
Distance at the side of the unit: 10 cm min.
►
Distance below the unit: Determined by the unit
supports.
4.2 Placement
The battery storage system can be installed if the
requirements listed in 4.1 are met.
►
Remove the packaging material.
►
Check the system for the components listed in the
scope of delivery.
►
Remove the Euro pallet and position the system at
the intended installation site.
4.3 Connection
The battery storage system can be installed if the
requirements listed in 4.1 and 4.2 are met.
►
Connect the system on the mains side (left/yellow
frame) and on the building side (right/green frame).
►
Please refer to the enclosed circuit diagram.
Circuit diagram.
►
Connect the system to the modem of the CHP
with the patch cable (1), starting from the battery
manager (2). Use a free LAN port to connect to the
modem.
1
2