![YANGZI YZ-X2 Operation Instructions Manual Download Page 10](http://html.mh-extra.com/html/yangzi/yz-x2/yz-x2_operation-instructions-manual_905482010.webp)
YZ-X2
8
from wear and tear. For installation, refer to "3.2 Brush plate
replacement and installation" for operation.
2.2 The operation process of the machine
Before start
●Before the normal operation of the machine, make sure that the
squeegee is installed correctly, and the sewage suction pipe is
inserted into the suction port.
Step 1: Unscrew the water-absorbing cross knob,
Pull the handle down and put down the water absorption swaying
tail bracket.
Step 2: Thread the Absorbent Fixing Screw through the Tripod.
Step 3: Install the sewage suction pipe.
The squeegee has been debugged at the factory and can be used
after installation
Power display
●After turning on the main power switch, the voltmeter will display
the battery voltage value. When the voltage is lower than 21V,
please charge it first.