6
2. PRE-OPERATION PROCEDURES
Installation Precautions & Preparations
WARNING!
3. Install in a location free of flammables and explosives.
Never install near flammables or explosives. This unit is NOT fire or blast resistant. Simply
switching the main power switch
“ON” or “OFF” can produce a spark, which could be relayed
during operation, causing a fire or explosion when near flammable or explosive fluids, chemicals
or gases/fumes. See
“List of Hazardous Substances” (P.40).
4. Installation Requirements
BO400 and BO410 models:
The oily smoke and steam generated from heating silicon oil is flammable and may cause a fire
hazard. Silicon oil also emits harmful gases when heated to high temperatures. A ventilation
hood must be installed above unit, with a fire extinguisher in close proximity.
×
Fire Extinguisher
Ventilation Hood
Summary of Contents for BM500
Page 2: ......