Perio
d
ic maintenance an
d
a
d
justment
6-8
6
To install the cowling
Place the cowling in the original posi-
tion, and then install the bolt, screws
and quick fastener.
Cowlin
g
C
To remove the cowling
1. Remove the cowling B. (See page
6-7.)
2. Remove the quick fastener and
screws, and then take the cowling
off.
To install the cowling
1. Place the cowling in the original
position, and then install the
screws and quick fastener.
2. Install the cowling B. (See page
6-7.)
1. Screw
2. Quick fastener
3. Cowling B
4. Bolt
1. Cowling C
2. Screw
3. Quick fastener
ZAUM1618
1
ZAUM1619
2
1
UB5GE1E0.book Page 8 Monday, August 26, 2019 3:02 PM