FOR YOUR SAFETY – PRE-OPERATION CHECKS
5-3
5
Front fork and rear shock ab-
sorber assembly
• Check that they operate smoothly and there is no oil leakage.
4-7, 4-9, 4-9, 7-26
Chassis fasteners
• Make sure that all nuts, bolts and screws are properly tightened.
• Tighten if necessary.
—
Moving parts and cables
• Check that the control cables move smoothly.
• Check that the control cables are not caught when the handlebars are turned or
when the front forks travel up and down.
• Lubricate moving parts and cables if necessary.
7-23, 7-24, 7-25, 7-25
Exhaust system
• Check that the exhaust pipe is tightly mounted and has no cracks.
• Check for leakage.
—
Ignition system
• Check that all leads and cables are properly connected.
7-8
ITEM
CHECKS
PAGE
U1SN80E0.book Page 3 Thursday, June 9, 2011 11:24 AM